The invention relates to the technical field of building construction, in particular to a fabricated steel structure building construction method. Comprising the following steps that SS01, pre-laying is conducted, specifically, a building construction area is constructed in a building construction site, a concrete carrying surface is poured in the building construction area, after the concrete carrying surface is coagulated and solidified, lines are drawn in the carrying surface for marking, and according to the drawn lines, two side supporting components are erected on the concrete carrying surface firstly; the upper supporting parts are arranged above the two side supporting parts, the metal skin is installed on the outer side of the steel structure after the upper supporting parts are arranged, and then the fabricated steel structure building is formed. The construction structure has the beneficial effects that the arrangement height and the arrangement shape of each profiling supporting module are adjustable, so that the construction structure can stably support skins in different shapes, and the gap amount between the outer skin and the supporting structure is reduced.
本发明涉及建筑施工技术领域,具体为装配式钢结构建筑施工方法。包括以下步骤:SS01、预布设,在建筑施工场所构建建筑施工区域,在建筑施工区域内浇筑混凝土搭载面,混凝土搭载面凝结固化后,在搭载面中画线标注,依据画线标注,首先在混凝土搭载面上搭设两个侧支撑部件,SS02、后布设,两个侧支撑部件布设后,在两个侧支撑部件的上方布设布设上支撑部件,上支撑部件布设后在钢结构的外侧安装金属蒙皮,继而形成装配式钢结构建筑。本发明的有益效果是:通过每个仿形支撑模块的布设高度及布设形状可调,从而使得本施工结构能够对不同形状的蒙皮进行稳定支撑并降低外部蒙皮与支撑结构之间的间隙量。
Fabricated steel structure building construction method
The invention relates to the technical field of building construction, in particular to a fabricated steel structure building construction method. Comprising the following steps that SS01, pre-laying is conducted, specifically, a building construction area is constructed in a building construction site, a concrete carrying surface is poured in the building construction area, after the concrete carrying surface is coagulated and solidified, lines are drawn in the carrying surface for marking, and according to the drawn lines, two side supporting components are erected on the concrete carrying surface firstly; the upper supporting parts are arranged above the two side supporting parts, the metal skin is installed on the outer side of the steel structure after the upper supporting parts are arranged, and then the fabricated steel structure building is formed. The construction structure has the beneficial effects that the arrangement height and the arrangement shape of each profiling supporting module are adjustable, so that the construction structure can stably support skins in different shapes, and the gap amount between the outer skin and the supporting structure is reduced.
本发明涉及建筑施工技术领域,具体为装配式钢结构建筑施工方法。包括以下步骤:SS01、预布设,在建筑施工场所构建建筑施工区域,在建筑施工区域内浇筑混凝土搭载面,混凝土搭载面凝结固化后,在搭载面中画线标注,依据画线标注,首先在混凝土搭载面上搭设两个侧支撑部件,SS02、后布设,两个侧支撑部件布设后,在两个侧支撑部件的上方布设布设上支撑部件,上支撑部件布设后在钢结构的外侧安装金属蒙皮,继而形成装配式钢结构建筑。本发明的有益效果是:通过每个仿形支撑模块的布设高度及布设形状可调,从而使得本施工结构能够对不同形状的蒙皮进行稳定支撑并降低外部蒙皮与支撑结构之间的间隙量。
Fabricated steel structure building construction method
一种装配式钢结构建筑施工方法
HOU GUANJUN (Autor:in) / GUAN HAITING (Autor:in) / HUANG TONGYA (Autor:in) / LIU JIURONG (Autor:in) / MAO GANG (Autor:in) / ZHAO YONGSHANG (Autor:in)
07.01.2025
Patent
Elektronische Ressource
Chinesisch
Steel structure fabricated building construction method
Europäisches Patentamt | 2024
|Fabricated steel structure building construction method
Europäisches Patentamt | 2023
|Fabricated steel structure building construction method
Europäisches Patentamt | 2023
|Steel structure fabricated building construction method
Europäisches Patentamt | 2020
|Steel structure fabricated building construction method
Europäisches Patentamt | 2021
|