Construction method for protecting steel member during staged implementation of structural column
The invention relates to the technical field of structural engineering construction, in particular to a construction method for protecting a steel member during staged implementation of a structural column, which comprises the following steps of: sleeving the periphery of the steel member with a protective sleeve; plastic plate inner formworks are erected on the inner side and the outer side of the protective sleeve, and the steel member is enclosed by the plastic plate inner formworks; pouring formworks are erected on the inner side and the outer side of the plastic plate, and certain distances are reserved between the formworks located on the inner side and the plastic plate and between the formworks located on the outer side and the plastic plate to form pouring spaces; and concrete materials easy to detach are poured into the pouring space to form the hollow-structure column head. The method has the advantages that concrete pouring in the middle area of the component and binding and dismantling of reinforcing steel bars for temporary fixing are reduced, so that the waste project amount is reduced, the project cost is saved, the construction period is shortened, a new thought is provided for effective protection of reserved long-term development reinforcing steel bars in the recent project implementation stage, the types of reserved reinforcing steel bar protection methods in projects are enriched, and the construction period is shortened. And a green construction concept is practiced.
本发明涉及结构工程施工技术领域,具体涉及一种结构柱分期实施时钢构件保护施工方法,包括如下步骤:在钢构件的外围套设保护套;在所述保护套的内、外两侧树立塑料板内模板,所述塑料板内模板围合所述钢构件;在所述塑料板的内、外两侧支立浇筑模板,位于内、外两侧的模板与所述塑料板之间分别留有一定距离形成浇筑空间;在所述浇筑空间内浇筑易拆除的混凝土材料形成空心结构柱头。本发明的优点是:减少了构件中间区域混凝土浇筑、临时固定用钢筋绑扎和拆除工作,从而减少废弃工程量、节约工程造价、节省工期,为近期工程实施阶段预留远期开发钢筋的有效保护提供新思路,从而丰富工程中预留钢筋保护方法的类型,实践绿色建造理念。
Construction method for protecting steel member during staged implementation of structural column
The invention relates to the technical field of structural engineering construction, in particular to a construction method for protecting a steel member during staged implementation of a structural column, which comprises the following steps of: sleeving the periphery of the steel member with a protective sleeve; plastic plate inner formworks are erected on the inner side and the outer side of the protective sleeve, and the steel member is enclosed by the plastic plate inner formworks; pouring formworks are erected on the inner side and the outer side of the plastic plate, and certain distances are reserved between the formworks located on the inner side and the plastic plate and between the formworks located on the outer side and the plastic plate to form pouring spaces; and concrete materials easy to detach are poured into the pouring space to form the hollow-structure column head. The method has the advantages that concrete pouring in the middle area of the component and binding and dismantling of reinforcing steel bars for temporary fixing are reduced, so that the waste project amount is reduced, the project cost is saved, the construction period is shortened, a new thought is provided for effective protection of reserved long-term development reinforcing steel bars in the recent project implementation stage, the types of reserved reinforcing steel bar protection methods in projects are enriched, and the construction period is shortened. And a green construction concept is practiced.
本发明涉及结构工程施工技术领域,具体涉及一种结构柱分期实施时钢构件保护施工方法,包括如下步骤:在钢构件的外围套设保护套;在所述保护套的内、外两侧树立塑料板内模板,所述塑料板内模板围合所述钢构件;在所述塑料板的内、外两侧支立浇筑模板,位于内、外两侧的模板与所述塑料板之间分别留有一定距离形成浇筑空间;在所述浇筑空间内浇筑易拆除的混凝土材料形成空心结构柱头。本发明的优点是:减少了构件中间区域混凝土浇筑、临时固定用钢筋绑扎和拆除工作,从而减少废弃工程量、节约工程造价、节省工期,为近期工程实施阶段预留远期开发钢筋的有效保护提供新思路,从而丰富工程中预留钢筋保护方法的类型,实践绿色建造理念。
Construction method for protecting steel member during staged implementation of structural column
一种结构柱分期实施时钢构件保护施工方法
WANG SHU (Autor:in) / DENG JIKUN (Autor:in) / CHEN FAN (Autor:in) / XIAO AN (Autor:in) / QIANG ZHENYU (Autor:in)
10.01.2025
Patent
Elektronische Ressource
Chinesisch
CONSTRUCTION METHOD FOR STEEL PIPE COLUMN MEMBER AND CONCRETE FILLING STEEL PIPE COLUMN
Europäisches Patentamt | 2018
|Asphalt pavement structural competency during staged airfield runway construction strategy
Taylor & Francis Verlag | 2024
|FULLY STAGED STEEL TRESTLE AND CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2024
|Multivariate stability assessment during staged construction
Online Contents | 2016
|Europäisches Patentamt | 2019
|