Outer wall screw hole blocking construction method
The invention relates to the technical field of decoration construction, in particular to an outer wall screw hole blocking construction method which comprises the steps that a movable grouting device comprising a mortar box, a mortar hose, a motor and a pressure switch is provided; reaming the outer side of the screw hole of the outer wall; the outer side of the screw hole of the outer wall is blocked, and a mortar cake is made; the threshold value of the pressure switch and the delay time of the time relay are set according to the size of the outer wall screw hole; a spray head of the mortar hose is inserted into an outer wall screw hole; when mortar flows through the motor, a switch of the motor is turned on, the pressure switch is turned off, when the pressure of the mortar flowing through the pressure switch reaches the pressure threshold value, the pressure switch sends a corresponding signal to the time relay, the time relay starts timing when receiving the signal, a circuit is turned off after set delay time is reached, and the motor stops working. The method has the characteristics of time and labor saving, high grouting speed and dense grouting, so that the hidden danger of leakage of the outer wall is greatly reduced, and the working efficiency is improved.
本发明涉及装饰装修施工技术领域,尤其涉及一种外墙螺杆洞封堵施工方法,包括:提供包括砂浆箱、砂浆软管、电机和压力开关的可移动注浆装置;对外墙螺杆洞的外侧进行扩孔;对外墙螺杆洞的外侧进行封堵,并做灰饼;根据该外墙螺杆洞的尺寸设置该压力开关的阈值以及该时间继电器的延迟时间;将该砂浆软管的喷头插入外墙螺杆洞中;打开该电机的开关并闭合压力开关,在流经压力开关的砂浆的压力达到该压力阈值时,该压力开关将相应的信号发送至该时间继电器,该时间继电器在接收信号时开始计时,并在达到设置的延迟时间后断开电路,该电机停止工作。该方法具有省时省力、灌浆速度快、灌浆密实的特点,从而大大降低了外墙渗漏隐患,又提高了作业效率。
Outer wall screw hole blocking construction method
The invention relates to the technical field of decoration construction, in particular to an outer wall screw hole blocking construction method which comprises the steps that a movable grouting device comprising a mortar box, a mortar hose, a motor and a pressure switch is provided; reaming the outer side of the screw hole of the outer wall; the outer side of the screw hole of the outer wall is blocked, and a mortar cake is made; the threshold value of the pressure switch and the delay time of the time relay are set according to the size of the outer wall screw hole; a spray head of the mortar hose is inserted into an outer wall screw hole; when mortar flows through the motor, a switch of the motor is turned on, the pressure switch is turned off, when the pressure of the mortar flowing through the pressure switch reaches the pressure threshold value, the pressure switch sends a corresponding signal to the time relay, the time relay starts timing when receiving the signal, a circuit is turned off after set delay time is reached, and the motor stops working. The method has the characteristics of time and labor saving, high grouting speed and dense grouting, so that the hidden danger of leakage of the outer wall is greatly reduced, and the working efficiency is improved.
本发明涉及装饰装修施工技术领域,尤其涉及一种外墙螺杆洞封堵施工方法,包括:提供包括砂浆箱、砂浆软管、电机和压力开关的可移动注浆装置;对外墙螺杆洞的外侧进行扩孔;对外墙螺杆洞的外侧进行封堵,并做灰饼;根据该外墙螺杆洞的尺寸设置该压力开关的阈值以及该时间继电器的延迟时间;将该砂浆软管的喷头插入外墙螺杆洞中;打开该电机的开关并闭合压力开关,在流经压力开关的砂浆的压力达到该压力阈值时,该压力开关将相应的信号发送至该时间继电器,该时间继电器在接收信号时开始计时,并在达到设置的延迟时间后断开电路,该电机停止工作。该方法具有省时省力、灌浆速度快、灌浆密实的特点,从而大大降低了外墙渗漏隐患,又提高了作业效率。
Outer wall screw hole blocking construction method
一种外墙螺杆洞封堵施工方法
LI YAO (Autor:in) / SUN ZHIWEI (Autor:in) / YAN HENG (Autor:in) / FAN ZHONGLEI (Autor:in) / HOU XIANWEI (Autor:in)
21.01.2025
Patent
Elektronische Ressource
Chinesisch
Blocking construction process for fully-interspersed outer wall screw hole
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2015
|Construction method for blocking outer wall screw hole by polyurethane foaming agent
Europäisches Patentamt | 2022
|