Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
VORRICHTUNG ZUM ABBAU VON MEERESGRUND
A device for removing sea bed includes a conveying line at least partially surrounded by sea water and an emergency emptying device arranged in the conveying line. The conveying line is configured to have a sea bed be removed therethrough so that a removed sea bed is transportable to a surface in a conveying direction. The emergency emptying device is configured so that the removed sea bed moving in a direction counter to the conveying direction in the conveying line is dischargeable from the conveying line into the sea water.
VORRICHTUNG ZUM ABBAU VON MEERESGRUND
A device for removing sea bed includes a conveying line at least partially surrounded by sea water and an emergency emptying device arranged in the conveying line. The conveying line is configured to have a sea bed be removed therethrough so that a removed sea bed is transportable to a surface in a conveying direction. The emergency emptying device is configured so that the removed sea bed moving in a direction counter to the conveying direction in the conveying line is dischargeable from the conveying line into the sea water.
VORRICHTUNG ZUM ABBAU VON MEERESGRUND
DEVICE FOR REMOVING SEA BED
DISPOSITIF D'EXPLOITATION DES FONDS MARINS
VON WIRTH HERMANN JOSEF (Autor:in)
30.12.2015
Patent
Elektronische Ressource
Deutsch
Tema Archiv | 1972
|Schatzsuche in Neptuns Reich -- Diamantenabbau vom Meeresgrund
Online Contents | 2007
|Bodenuntersuchungen auf dem Meeresgrund - die Entwicklungsgeschichte des UBUG
Tema Archiv | 1982
|Rammpfahl sowie Verfahren zur Einbringung eines Rammpfahls in den Meeresgrund
Europäisches Patentamt | 2015
|Bauen im Ausland - 30000 t schwere Tunnelsegmente werden auf den Meeresgrund abgesenkt
Online Contents | 2009