A platform for research: civil engineering, architecture and urbanism
VORRICHTUNG ZUM ABBAU VON MEERESGRUND
A device for removing sea bed includes a conveying line at least partially surrounded by sea water and an emergency emptying device arranged in the conveying line. The conveying line is configured to have a sea bed be removed therethrough so that a removed sea bed is transportable to a surface in a conveying direction. The emergency emptying device is configured so that the removed sea bed moving in a direction counter to the conveying direction in the conveying line is dischargeable from the conveying line into the sea water.
VORRICHTUNG ZUM ABBAU VON MEERESGRUND
A device for removing sea bed includes a conveying line at least partially surrounded by sea water and an emergency emptying device arranged in the conveying line. The conveying line is configured to have a sea bed be removed therethrough so that a removed sea bed is transportable to a surface in a conveying direction. The emergency emptying device is configured so that the removed sea bed moving in a direction counter to the conveying direction in the conveying line is dischargeable from the conveying line into the sea water.
VORRICHTUNG ZUM ABBAU VON MEERESGRUND
DEVICE FOR REMOVING SEA BED
DISPOSITIF D'EXPLOITATION DES FONDS MARINS
VON WIRTH HERMANN JOSEF (author)
2015-12-30
Patent
Electronic Resource
German
Tema Archive | 1972
|Schatzsuche in Neptuns Reich -- Diamantenabbau vom Meeresgrund
Online Contents | 2007
|Bodenuntersuchungen auf dem Meeresgrund - die Entwicklungsgeschichte des UBUG
Tema Archive | 1982
|Rammpfahl sowie Verfahren zur Einbringung eines Rammpfahls in den Meeresgrund
European Patent Office | 2015
|Bauen im Ausland - 30000 t schwere Tunnelsegmente werden auf den Meeresgrund abgesenkt
Online Contents | 2009