Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
VERFAHREN ZUM EINBRINGEN EINER MEHRZAHL VON SPANNGLIEDERN IN EINEN TURM UNTER VERWENDUNG EINES KRANS UND ABWICKELVORRICHTUNG ZUR VERWENDUNG IN DIESEM VERFAHREN
A method for inserting a plurality of tendons (26) into a tower (14) comprises the steps: provision of the tendons (26) in a storage area (32), picking up one of the tendons (26) by means of the pick-up device (34) of a crane (38), raising the tendon (26) to the top of the tower (14), insertion of the tendon (26) into the tower (14) from above, lowering the pick-up device (34) to the storage area (32). According to the present invention, after being raised to the top of the tower (14) and prior to the insertion of the tendon (26) into the tower, the tendons (26) are brought into unwinding engagement with an unwinding device (30), which is permanently arranged there for at least the duration of the insertion procedure, and the pick-up device (34) is already again lowered to the storage area (32) while the tendon (26) just raised to the top of the tower is inserted into the tower (14) from above by means of the unwinding device (30).
VERFAHREN ZUM EINBRINGEN EINER MEHRZAHL VON SPANNGLIEDERN IN EINEN TURM UNTER VERWENDUNG EINES KRANS UND ABWICKELVORRICHTUNG ZUR VERWENDUNG IN DIESEM VERFAHREN
A method for inserting a plurality of tendons (26) into a tower (14) comprises the steps: provision of the tendons (26) in a storage area (32), picking up one of the tendons (26) by means of the pick-up device (34) of a crane (38), raising the tendon (26) to the top of the tower (14), insertion of the tendon (26) into the tower (14) from above, lowering the pick-up device (34) to the storage area (32). According to the present invention, after being raised to the top of the tower (14) and prior to the insertion of the tendon (26) into the tower, the tendons (26) are brought into unwinding engagement with an unwinding device (30), which is permanently arranged there for at least the duration of the insertion procedure, and the pick-up device (34) is already again lowered to the storage area (32) while the tendon (26) just raised to the top of the tower is inserted into the tower (14) from above by means of the unwinding device (30).
VERFAHREN ZUM EINBRINGEN EINER MEHRZAHL VON SPANNGLIEDERN IN EINEN TURM UNTER VERWENDUNG EINES KRANS UND ABWICKELVORRICHTUNG ZUR VERWENDUNG IN DIESEM VERFAHREN
METHOD FOR INSERTING A PLURALITY OF TENDONS INTO A TOWER BY MEANS OF A CRANE, AND UNWINDING DEVICE FOR USE IN SAID METHOD
PROCÉDÉ DE MONTAGE D'UNE PLURALITÉ D'ÉLÉMENTS DE PRÉCONTRAINTE DANS UNE TOUR AU MOYEN D'UNE GRUE ET DISPOSITIF DE DÉROULAGE DESTINÉ À ÊTRE UTILISÉ DANS LEDIT PROCÉDÉ
OFFENBERG PETER (Autor:in) / SCHRÖDER JÜRGEN (Autor:in) / HEGMANN BENEDIKT (Autor:in)
12.06.2019
Patent
Elektronische Ressource
Deutsch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
B65H
HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
,
Handhaben von dünnem oder fadenförmigem Gut, z.B. Folien, Bahnen, Kabeln
/
B66C
Krane
,
CRANES
/
B66D
Haspeln
,
CAPSTANS
/
F03D
Windkraftmaschinen
,
WIND MOTORS
Europäisches Patentamt | 2016
|Europäisches Patentamt | 2019
|Europäisches Patentamt | 2019
|Europäisches Patentamt | 2019
|