MIT WENIGSTENS EINEM SPANNGLIED VORGESPANNTES BAUWERK SOWIE VERFAHREN ZUR HERSTELLUNG EINES MIT WENIGSTENS EINEM SPANNGLIED VORGESPANNTEN BAUWERKS
A structure, in particular, a wind turbine tower (1), which is pre-tensioned with at least one tensioning element (3), has a foundation (2), a concrete tower section (4), in particular, consisting of a plurality of precast concrete elements (5), as well as a head piece (6), wherein the tensioning element (3) at least at one of its ends has a tendon anchor (7, 7a, 7b). The tendon anchor (7, 7a, 7b) has an accommodation (8) in which a first end (10a) of an anchor rod (9) is fastened, in particular screwed in. A second end (10b) of the anchor rod (9) is anchored to the foundation (2) or to the head piece (6). In a corresponding method for manufacturing a structure, a first end (10a) of an anchor rod (9) is fastened, in particular screwed in an accommodation (8) of a tendon anchor (7, 7a, 7b), and a second end (10b) of the anchor rod (9) is anchored to the foundation (2) or to the head piece (6).
MIT WENIGSTENS EINEM SPANNGLIED VORGESPANNTES BAUWERK SOWIE VERFAHREN ZUR HERSTELLUNG EINES MIT WENIGSTENS EINEM SPANNGLIED VORGESPANNTEN BAUWERKS
A structure, in particular, a wind turbine tower (1), which is pre-tensioned with at least one tensioning element (3), has a foundation (2), a concrete tower section (4), in particular, consisting of a plurality of precast concrete elements (5), as well as a head piece (6), wherein the tensioning element (3) at least at one of its ends has a tendon anchor (7, 7a, 7b). The tendon anchor (7, 7a, 7b) has an accommodation (8) in which a first end (10a) of an anchor rod (9) is fastened, in particular screwed in. A second end (10b) of the anchor rod (9) is anchored to the foundation (2) or to the head piece (6). In a corresponding method for manufacturing a structure, a first end (10a) of an anchor rod (9) is fastened, in particular screwed in an accommodation (8) of a tendon anchor (7, 7a, 7b), and a second end (10b) of the anchor rod (9) is anchored to the foundation (2) or to the head piece (6).
MIT WENIGSTENS EINEM SPANNGLIED VORGESPANNTES BAUWERK SOWIE VERFAHREN ZUR HERSTELLUNG EINES MIT WENIGSTENS EINEM SPANNGLIED VORGESPANNTEN BAUWERKS
STRUCTURE PRETENSIONED BY AT LEAST ONE TENSIONING ELEMENT, AND METHOD FOR PRODUCING A STRUCTURE PRETENSIONED BY AT LEAST ONE TENSIONING ELEMENT
STRUCTURE PRÉCONTRAINTE PAR AU MOINS UN ÉLÉMENT TENDEUR, ET PROCÉDÉ DE FABRICATION D'UNE STRUCTURE PRÉCONTRAINTE PAR AU MOINS UN ÉLÉMENT TENDEUR