Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
VERFAHREN ZUM BETREIBEN EINER ANLAGE ZUR HERSTELLUNG UND/ ODER HANDHABUNG VON ZEMENTKLINKER
The present invention relates to a method for operating a system (10, 11) for producing and/or handling cement, comprising the steps: - removing a material sample (42) of cement clinker from a system (10, 11) for producing and/or handling cement, - metering an activation fluid to the material sample (42), - measuring the gas pressure and/or the amount of hydrogen gas and/or the amount of elemental aluminum in the mix of activation fluid and the material sample (42), and - controlling/regulating the fuel discharge (36, 38) from a fuel dump (18, 34) to supply a firing device (12, 14) of the system (10, 11) for producing cement according to the measured gas pressure and/or the measured amount of hydrogen gas and/or the amount of elemental aluminum, or - controlling/regulating the cement discharge (54) from a cement store (56, 58) in order to supply the cement to a handling device (52) of the system (10, 11) for handling cement according to the measured gas pressure and/or the measured amount of hydrogen gas and/or the amount of elemental aluminum.
VERFAHREN ZUM BETREIBEN EINER ANLAGE ZUR HERSTELLUNG UND/ ODER HANDHABUNG VON ZEMENTKLINKER
The present invention relates to a method for operating a system (10, 11) for producing and/or handling cement, comprising the steps: - removing a material sample (42) of cement clinker from a system (10, 11) for producing and/or handling cement, - metering an activation fluid to the material sample (42), - measuring the gas pressure and/or the amount of hydrogen gas and/or the amount of elemental aluminum in the mix of activation fluid and the material sample (42), and - controlling/regulating the fuel discharge (36, 38) from a fuel dump (18, 34) to supply a firing device (12, 14) of the system (10, 11) for producing cement according to the measured gas pressure and/or the measured amount of hydrogen gas and/or the amount of elemental aluminum, or - controlling/regulating the cement discharge (54) from a cement store (56, 58) in order to supply the cement to a handling device (52) of the system (10, 11) for handling cement according to the measured gas pressure and/or the measured amount of hydrogen gas and/or the amount of elemental aluminum.
VERFAHREN ZUM BETREIBEN EINER ANLAGE ZUR HERSTELLUNG UND/ ODER HANDHABUNG VON ZEMENTKLINKER
METHOD FOR OPERATING A SYSTEM FOR PRODUCING AND/OR HANDLING CEMENT CLINKER
PROCÉDÉ DE FONCTIONNEMENT D'UN SYSTÈME DE PRODUCTION ET/OU DE MANIPULATION DE CLINKER DE CIMENT
ENDERS MICHAEL (Autor:in) / NEUMANN THOMAS (Autor:in) / WEIGAND PATRICK (Autor:in)
25.12.2024
Patent
Elektronische Ressource
Deutsch
IPC:
C04B
Kalk
,
LIME
Verfahren zum Betreiben einer Anlage zur Herstellung und/ oder Handhabung von Zementklinker
Europäisches Patentamt | 2022
|VERFAHREN ZUM BETREIBEN EINER ANLAGE ZUR HERSTELLUNG UND/ ODER HANDHABUNG VON ZEMENTKLINKER
Europäisches Patentamt | 2022
|ANLAGE ZUR HERSTELLUNG VON ZEMENTKLINKER UND VERFAHREN ZUM BETREIBEN EINER SOLCHEN ANLAGE
Europäisches Patentamt | 2020
|Anlage zur Herstellung von Zementklinker und Verfahren zum Betreiben einer solchen Anlage
Europäisches Patentamt | 2018
|ANLAGE ZUR HERSTELLUNG VON ZEMENTKLINKER UND VERFAHREN ZUM BETREIBEN EINER SOLCHEN ANLAGE
Europäisches Patentamt | 2018
|