Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method and system for executing a worksite plan to modify a work surface at a worksite
A method includes receiving a worksite plan to be executed by at least one machine at a worksite from a computing device of a supervising entity, the controller being located at a non-line-of-sight (NLOS) location with respect to the worksite. The worksite plan may include a boundary of the worksite at which the worksite plan is implemented, at least one task defining the worksite plan, and a selection of at least one machine to perform the task. The method may include receiving a validation signal from a device located at the worksite, the validation indicating that the worksite is ready for implementation of the worksite plan based on at least one parameter of worksite readiness. The method may include selecting a first mode of operation of the machine to perform the task and transmitting first instructions to the machine to perform the task based on the first mode of operation.
Method and system for executing a worksite plan to modify a work surface at a worksite
A method includes receiving a worksite plan to be executed by at least one machine at a worksite from a computing device of a supervising entity, the controller being located at a non-line-of-sight (NLOS) location with respect to the worksite. The worksite plan may include a boundary of the worksite at which the worksite plan is implemented, at least one task defining the worksite plan, and a selection of at least one machine to perform the task. The method may include receiving a validation signal from a device located at the worksite, the validation indicating that the worksite is ready for implementation of the worksite plan based on at least one parameter of worksite readiness. The method may include selecting a first mode of operation of the machine to perform the task and transmitting first instructions to the machine to perform the task based on the first mode of operation.
Method and system for executing a worksite plan to modify a work surface at a worksite
GAUTHAM SUBRAMANIAN (Autor:in) / MARK WILLIAM WHITING (Autor:in)
04.10.2023
Patent
Elektronische Ressource
Englisch
IPC:
E02F
Baggern
,
DREDGING
Method and system for executing worksite plan to modify work surface at worksite
Europäisches Patentamt | 2023
|METHOD AND SYSTEM FOR EXECUTING A WORKSITE PLAN TO MODIFY A WORK SURFACE AT A WORKSITE
Europäisches Patentamt | 2021
|System and method for executing a project plan at worksite
Europäisches Patentamt | 2017
|SYSTEM AND METHOD FOR EXECUTING A PROJECT PLAN AT WORKSITE
Europäisches Patentamt | 2017
|WORKSITE MANAGEMENT SYSTEM AND WORKSITE MANAGEMENT METHOD
Europäisches Patentamt | 2024
|