ARTIFICIAL GROUND AND ARTIFICIAL GROUND CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an efficient and low-cost construction method for an artificial ground planned at a shallower level than an underground skeleton of an existing structure.SOLUTION: Columns, beams, walls and others remain in a space 20 above a batholith part 14 of an underground skeleton 12 of an existing structure. By pouring fluidized soil 30 into the space, a first layer 102 is formed onto which recycled materials 40 including demolished concrete generated in the demolition of the existing structure may be back-filled. By forming a second layer 106 by back-filling the recycled materials 40 including demolished concrete onto the first layer 102 and compacting, an artificial ground 100 capable of supporting a new structure may be constructed easily at low costs, on the batholith part 14. At the same time, the amount of demolished concrete carried out and disposed may be reduced, suppressing the carry-out and disposal costs. Thus, the artificial ground 100 may be constructed efficiently and at low costs, with a leveling work surface L planned at a shallower depth than the underground skeleton 12 of the existing building.
【課題】既存構造物の地下躯体以浅に計画された人工地盤を効率的に低コストで構築する。【解決手段】既存構造物の地下躯体12の底盤部14の上の空間部20は、例えば、柱、梁、壁などが残っているが、流動化処理土30を流し込むことで、既存構造物の解体によって発生した解体コンクリートを含む再生材40を上部に埋め戻すことが可能な第一層102が形成される。そして、この第一層102の上に、解体コンクリートを含む再生材40を埋め戻して締め固め第二層106を形成することで、底盤部14の上に、新築構造物を支持することが可能な人工地盤100を容易に低コストで構築することができると共に、解体コンクリートを搬出量及び処理量が削減され、搬出費用及び処理費用が抑制される。したがって、既存構造物の地下躯体12以浅に計画床付レベルLが計画された人工地盤100を効率的に低コストで構築することができる。【選択図】図1
ARTIFICIAL GROUND AND ARTIFICIAL GROUND CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an efficient and low-cost construction method for an artificial ground planned at a shallower level than an underground skeleton of an existing structure.SOLUTION: Columns, beams, walls and others remain in a space 20 above a batholith part 14 of an underground skeleton 12 of an existing structure. By pouring fluidized soil 30 into the space, a first layer 102 is formed onto which recycled materials 40 including demolished concrete generated in the demolition of the existing structure may be back-filled. By forming a second layer 106 by back-filling the recycled materials 40 including demolished concrete onto the first layer 102 and compacting, an artificial ground 100 capable of supporting a new structure may be constructed easily at low costs, on the batholith part 14. At the same time, the amount of demolished concrete carried out and disposed may be reduced, suppressing the carry-out and disposal costs. Thus, the artificial ground 100 may be constructed efficiently and at low costs, with a leveling work surface L planned at a shallower depth than the underground skeleton 12 of the existing building.
【課題】既存構造物の地下躯体以浅に計画された人工地盤を効率的に低コストで構築する。【解決手段】既存構造物の地下躯体12の底盤部14の上の空間部20は、例えば、柱、梁、壁などが残っているが、流動化処理土30を流し込むことで、既存構造物の解体によって発生した解体コンクリートを含む再生材40を上部に埋め戻すことが可能な第一層102が形成される。そして、この第一層102の上に、解体コンクリートを含む再生材40を埋め戻して締め固め第二層106を形成することで、底盤部14の上に、新築構造物を支持することが可能な人工地盤100を容易に低コストで構築することができると共に、解体コンクリートを搬出量及び処理量が削減され、搬出費用及び処理費用が抑制される。したがって、既存構造物の地下躯体12以浅に計画床付レベルLが計画された人工地盤100を効率的に低コストで構築することができる。【選択図】図1
ARTIFICIAL GROUND AND ARTIFICIAL GROUND CONSTRUCTION METHOD
人工地盤及び人工地盤の構築工法
URABE MASAAKI (Autor:in) / SUZUKI KATSUNORI (Autor:in) / OTOMO RYOSUKE (Autor:in) / MUTO HAJIME (Autor:in) / TAYA YUJI (Autor:in)
08.06.2015
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Artificial ground freezing method and artificial ground freezing system
Europäisches Patentamt | 2019
|ARTIFICIAL GROUND FREEZING METHOD AND ARTIFICIAL GROUND FREEZING SYSTEM
Europäisches Patentamt | 2017
|ARTIFICIAL LAWN GROUND AND CONSTRUCTION METHOD FOR SAME
Europäisches Patentamt | 2018
|