ARTIFICIAL GROUND AND CONSTRUCTION METHOD THEREOF
To provide an artificial ground which can improve work efficiency during construction.SOLUTION: An artificial ground 1 comprises a pedestal 6 connected to a pile head 3 of each steel pipe pile 2 via support holes, a precast beam member 8 on which both end portions 8a and 8a are respectively placed on the pedestals 6 and 6 of the adjacent steel pipe piles 2 and 2, and which is installed between the steel pipe piles 2 and 2, and a precast floor plate 9 on which a peripheral end portion is placed on a receiving portion of each precast beam member 8 and which covers a space surrounded with each precast beam member 8. As a result, work efficiency can be improved during construction.SELECTED DRAWING: Figure 4
【課題】施工時、作業効率を向上させることができる人工地盤を提供する。【解決手段】人工地盤1は、支持孔を介して各鋼管杭2の杭頭部3にそれぞれ連結される台座6と、該隣接する鋼管杭2、2の台座6、6上に両端部8a、8aがそれぞれ載置され、各鋼管杭2、2間に架設されるプレキャスト梁部材8と、該各プレキャスト梁部材8の受け部上に周端部が載置され、各プレキャスト梁部材8にて囲まれる空間を覆うプレキャスト床板9と、を概略備えている。これにより、施工時、作業効率を向上させることができる。【選択図】図4
ARTIFICIAL GROUND AND CONSTRUCTION METHOD THEREOF
To provide an artificial ground which can improve work efficiency during construction.SOLUTION: An artificial ground 1 comprises a pedestal 6 connected to a pile head 3 of each steel pipe pile 2 via support holes, a precast beam member 8 on which both end portions 8a and 8a are respectively placed on the pedestals 6 and 6 of the adjacent steel pipe piles 2 and 2, and which is installed between the steel pipe piles 2 and 2, and a precast floor plate 9 on which a peripheral end portion is placed on a receiving portion of each precast beam member 8 and which covers a space surrounded with each precast beam member 8. As a result, work efficiency can be improved during construction.SELECTED DRAWING: Figure 4
【課題】施工時、作業効率を向上させることができる人工地盤を提供する。【解決手段】人工地盤1は、支持孔を介して各鋼管杭2の杭頭部3にそれぞれ連結される台座6と、該隣接する鋼管杭2、2の台座6、6上に両端部8a、8aがそれぞれ載置され、各鋼管杭2、2間に架設されるプレキャスト梁部材8と、該各プレキャスト梁部材8の受け部上に周端部が載置され、各プレキャスト梁部材8にて囲まれる空間を覆うプレキャスト床板9と、を概略備えている。これにより、施工時、作業効率を向上させることができる。【選択図】図4
ARTIFICIAL GROUND AND CONSTRUCTION METHOD THEREOF
人工地盤及びその施工方法
TOKIWA SATOSHI (Autor:in)
13.12.2018
Patent
Elektronische Ressource
Japanisch
ARTIFICIAL GROUND AND ARTIFICIAL GROUND CONSTRUCTION METHOD
Europäisches Patentamt | 2015
|Outdoor special artificial turf protection ground structure and construction method thereof
Europäisches Patentamt | 2021
|COMPOSITE GROUND OF ARTIFICIAL AND NATURAL LAWN, AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2017
|ARTIFICIAL LAWN GROUND AND CONSTRUCTION METHOD FOR SAME
Europäisches Patentamt | 2018
|Ground dry construction structure and construction method thereof
Europäisches Patentamt | 2021
|