Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD OF CONSTRUCTING REINFORCEMENT SLAB
PROBLEM TO BE SOLVED: To provide a method of constructing a reinforcement slab that can easily form a gap between an upper surface of a slab of an existing structure and the reinforcement slab.SOLUTION: There is provided a method of constructing a reinforcement slab in which a reinforcement slab 2 is provided leaving a gap ST with an upper surface 3a of a ceiling slab 3. This method includes: an arranging process of arranging a tubular body 12 capable of forming a closed space SC1 increasing in height as a fluid is supplied on the side of the upper surface 3a of the ceiling slab 3; a casting process of casting the reinforcement slab 2 on the side of the upper surface 3a of the ceiling slab 3 and above the tubular body 12 after the arranging process; a fluid supply process of elevating the reinforcement slab 2 by the closed space SC1 by supplying air to the closed space SC1 formed of the tubular body 12 after the casting process; and a support member forming process of providing reinforcement slab support members 8, 9 between the ceiling slab 3 and reinforcement slab 2 while the reinforcement slab 2 is elevated in the fluid supply process.
【課題】既設構造物のスラブの上面と補強スラブとの間の隙間を容易に形成することができる補強スラブの施工方法を提供する。【解決手段】天井スラブ3の上面3aとの間に隙間STを空けて補強スラブ2を設ける補強スラブの施工方法である。この方法は、天井スラブ3の上面3a側に、流体の供給によって高さが高くなる閉鎖空間SC1を形成可能な管状体12を配置する配置工程と、配置工程よりも後に、天井スラブ3の上面3a側であって、管状体12より上側に補強スラブ2を打設する打設工程と、打設工程よりも後に、管状体12によって形成された閉鎖空間SC1に空気を供給して閉鎖空間SC1によって補強スラブ2を上昇させる流体供給工程と、流体供給工程によって補強スラブ2を上昇させている間に、天井スラブ3と補強スラブ2との間に補強スラブ支持部材8,9を設ける支持部材形成工程とを備えている。【選択図】図3
METHOD OF CONSTRUCTING REINFORCEMENT SLAB
PROBLEM TO BE SOLVED: To provide a method of constructing a reinforcement slab that can easily form a gap between an upper surface of a slab of an existing structure and the reinforcement slab.SOLUTION: There is provided a method of constructing a reinforcement slab in which a reinforcement slab 2 is provided leaving a gap ST with an upper surface 3a of a ceiling slab 3. This method includes: an arranging process of arranging a tubular body 12 capable of forming a closed space SC1 increasing in height as a fluid is supplied on the side of the upper surface 3a of the ceiling slab 3; a casting process of casting the reinforcement slab 2 on the side of the upper surface 3a of the ceiling slab 3 and above the tubular body 12 after the arranging process; a fluid supply process of elevating the reinforcement slab 2 by the closed space SC1 by supplying air to the closed space SC1 formed of the tubular body 12 after the casting process; and a support member forming process of providing reinforcement slab support members 8, 9 between the ceiling slab 3 and reinforcement slab 2 while the reinforcement slab 2 is elevated in the fluid supply process.
【課題】既設構造物のスラブの上面と補強スラブとの間の隙間を容易に形成することができる補強スラブの施工方法を提供する。【解決手段】天井スラブ3の上面3aとの間に隙間STを空けて補強スラブ2を設ける補強スラブの施工方法である。この方法は、天井スラブ3の上面3a側に、流体の供給によって高さが高くなる閉鎖空間SC1を形成可能な管状体12を配置する配置工程と、配置工程よりも後に、天井スラブ3の上面3a側であって、管状体12より上側に補強スラブ2を打設する打設工程と、打設工程よりも後に、管状体12によって形成された閉鎖空間SC1に空気を供給して閉鎖空間SC1によって補強スラブ2を上昇させる流体供給工程と、流体供給工程によって補強スラブ2を上昇させている間に、天井スラブ3と補強スラブ2との間に補強スラブ支持部材8,9を設ける支持部材形成工程とを備えている。【選択図】図3
METHOD OF CONSTRUCTING REINFORCEMENT SLAB
補強スラブの施工方法
YASUNAGA MASAMICHI (Autor:in)
30.07.2015
Patent
Elektronische Ressource
Japanisch