Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METAL FITTING, BUILDING SKELETON AND INSTALLATION STRUCTURE OF LIGHTWEIGHT CELLULAR CONCRETE PANEL
PROBLEM TO BE SOLVED: To provide technologies that help improve the workability when installing a lightweight cellular concrete panel on a building skeleton and the ease of transportation and handling at a site of the building skeleton.SOLUTION: An L-shaped plate 4 is fixed on a plane part 30a of a steel beam 30 by welding and other methods, and a bolt with a loop 2 is fitted rotatably on the L-shaped plate 4 using a hexagon head bolt 6 and a nut 7. This way, the bolt with a loop 2 is supported variably between a perpendicularly erected state and a slanted state relative to the steel beam 30. By keeping the bolt with a loop 2 in a perpendicularly erected state relative to the steel beam 30 only when a lightweight cellular concrete panel 50 is fitted on the steel beam 30, improvement in the workability when fitting the lightweight cellular concrete panel 50 to the steel beam 30 and the ease of transportation and handling of the steel beam 30 may all be achieved.
【課題】軽量気泡コンクリートパネルを建物躯体へ取り付ける際の作業性、建物躯体の搬送性および現場での取り扱い性の向上に資する技術を提供すること。【解決手段】鉄骨梁30の平面部30aに溶接等によりL字型プレート4を取り付け固定し、六角ボルト6およびナット7によってメガネボルト2を当該L字型プレート4に回転可能に取り付ける。これにより、メガネボルト2が鉄骨梁30に対して直立した状態と倒伏した状態との間で状態変更可能に支持される。軽量気泡コンクリートパネル50を鉄骨梁30へ取り付ける際にのみメガネボルト2を鉄骨梁30に対して直立した状態とすることにより、軽量気泡コンクリートパネル50の鉄骨梁30への取り付け作業の作業性向上と鉄骨梁30の搬送性および取り扱い性の向上とを両立させることができる。【選択図】図2
METAL FITTING, BUILDING SKELETON AND INSTALLATION STRUCTURE OF LIGHTWEIGHT CELLULAR CONCRETE PANEL
PROBLEM TO BE SOLVED: To provide technologies that help improve the workability when installing a lightweight cellular concrete panel on a building skeleton and the ease of transportation and handling at a site of the building skeleton.SOLUTION: An L-shaped plate 4 is fixed on a plane part 30a of a steel beam 30 by welding and other methods, and a bolt with a loop 2 is fitted rotatably on the L-shaped plate 4 using a hexagon head bolt 6 and a nut 7. This way, the bolt with a loop 2 is supported variably between a perpendicularly erected state and a slanted state relative to the steel beam 30. By keeping the bolt with a loop 2 in a perpendicularly erected state relative to the steel beam 30 only when a lightweight cellular concrete panel 50 is fitted on the steel beam 30, improvement in the workability when fitting the lightweight cellular concrete panel 50 to the steel beam 30 and the ease of transportation and handling of the steel beam 30 may all be achieved.
【課題】軽量気泡コンクリートパネルを建物躯体へ取り付ける際の作業性、建物躯体の搬送性および現場での取り扱い性の向上に資する技術を提供すること。【解決手段】鉄骨梁30の平面部30aに溶接等によりL字型プレート4を取り付け固定し、六角ボルト6およびナット7によってメガネボルト2を当該L字型プレート4に回転可能に取り付ける。これにより、メガネボルト2が鉄骨梁30に対して直立した状態と倒伏した状態との間で状態変更可能に支持される。軽量気泡コンクリートパネル50を鉄骨梁30へ取り付ける際にのみメガネボルト2を鉄骨梁30に対して直立した状態とすることにより、軽量気泡コンクリートパネル50の鉄骨梁30への取り付け作業の作業性向上と鉄骨梁30の搬送性および取り扱い性の向上とを両立させることができる。【選択図】図2
METAL FITTING, BUILDING SKELETON AND INSTALLATION STRUCTURE OF LIGHTWEIGHT CELLULAR CONCRETE PANEL
取付金具および建物躯体並びに軽量気泡コンクリートパネル取付構造
SUGAYA NORIHISA (Autor:in) / OCHIAI KENJI (Autor:in)
07.12.2015
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
METAL FITTING, BUILDING SKELETON AND FITTING STRUCTURE FOR LIGHTWEIGHT CELLULAR CONCRETE PANEL
Europäisches Patentamt | 2015
|INSTALLATION METAL FITTING FOR LIGHTWEIGHT CELLULAR CONCRETE
Europäisches Patentamt | 2015
|LIGHTWEIGHT CELLULAR CONCRETE PANEL AND INSTALLATION STRUCTURE THEREOF
Europäisches Patentamt | 2015
|INSTALLATION HARDWARE FOR LIGHTWEIGHT CELLULAR CONCRETE PANEL
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2017
|