Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
REINFORCING BAR ARRANGEMENT JIG
PROBLEM TO BE SOLVED: To provide a reinforcing bar arrangement jig capable of efficiently arranging a main reinforcement of a half PCa beam and other reinforced concrete members, for curtailing a construction period and reducing man-hours.SOLUTION: A reinforcing bar arrangement jig A is used for arranging a main reinforcement of a reinforced concrete member, and includes: a shaft bearing part 10 extending in a vertical direction A; a roller part 11 having an end connected to the shaft bearing part 10, the connection being rotatable around a rotation axis O1 extending in a horizontal direction T2; a lifting holding part 13 connected directly or indirectly to the shaft bearing part 10 and extended upward, the lifting holding part having a grip 12 to be held by an operator; and a locking part 14 installed integrally with the shaft bearing part 10 or the lifting holding part 13, above the roller part 11 leaving an interval, the locking part being hooked on a shear reinforcement for locking the reinforcing bar arrangement jig A.
【課題】ハーフPCa梁などの鉄筋コンクリート部材の主筋を効率的に配筋することができ、工期の短縮、人工の削減を図ることを可能にする配筋用治具を提供する。【解決手段】鉄筋コンクリート部材の主筋を配筋する際に用いる配筋用治具Aであって、上下方向Aに延びる軸受け部10と、水平方向T2に延びる回転軸O1周りに回転自在に一端を軸受け部10に接続して設けられたローラー部11と、軸受け部10に直接的あるいは間接的に繋がって上方に延設されるとともに、作業者が把持する取っ手12を備えた引上げ把持部13と、ローラー部11の上方に間隔をあけ、軸受け部10あるいは引上げ把持部13に一体に設けられ、せん断補強筋に引っ掛けて配筋用治具Aを係止するための係止部14とを備える。【選択図】図2
REINFORCING BAR ARRANGEMENT JIG
PROBLEM TO BE SOLVED: To provide a reinforcing bar arrangement jig capable of efficiently arranging a main reinforcement of a half PCa beam and other reinforced concrete members, for curtailing a construction period and reducing man-hours.SOLUTION: A reinforcing bar arrangement jig A is used for arranging a main reinforcement of a reinforced concrete member, and includes: a shaft bearing part 10 extending in a vertical direction A; a roller part 11 having an end connected to the shaft bearing part 10, the connection being rotatable around a rotation axis O1 extending in a horizontal direction T2; a lifting holding part 13 connected directly or indirectly to the shaft bearing part 10 and extended upward, the lifting holding part having a grip 12 to be held by an operator; and a locking part 14 installed integrally with the shaft bearing part 10 or the lifting holding part 13, above the roller part 11 leaving an interval, the locking part being hooked on a shear reinforcement for locking the reinforcing bar arrangement jig A.
【課題】ハーフPCa梁などの鉄筋コンクリート部材の主筋を効率的に配筋することができ、工期の短縮、人工の削減を図ることを可能にする配筋用治具を提供する。【解決手段】鉄筋コンクリート部材の主筋を配筋する際に用いる配筋用治具Aであって、上下方向Aに延びる軸受け部10と、水平方向T2に延びる回転軸O1周りに回転自在に一端を軸受け部10に接続して設けられたローラー部11と、軸受け部10に直接的あるいは間接的に繋がって上方に延設されるとともに、作業者が把持する取っ手12を備えた引上げ把持部13と、ローラー部11の上方に間隔をあけ、軸受け部10あるいは引上げ把持部13に一体に設けられ、せん断補強筋に引っ掛けて配筋用治具Aを係止するための係止部14とを備える。【選択図】図2
REINFORCING BAR ARRANGEMENT JIG
配筋用治具
OKAMOTO DAIGO (Autor:in) / SUGIMOTO YOSHIHIDE (Autor:in) / IKETANI TETSUYA (Autor:in)
07.01.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
REINFORCING-BAR ARRANGEMENT INSPECTION METHOD AND REINFORCING-BAR ARRANGEMENT INSPECTION DEVICE
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2016
|REINFORCING BAR ARRANGEMENT DEVICE AND REINFORCING BAR CONSTRUCTION METHOD
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2017
|