Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BEARING INSTALLATION METHOD AND BEARING STRUCTURE
PROBLEM TO BE SOLVED: To provide a bearing installation method and a bearing structure for solving conventional problems, specifically, facilitating height adjustment of an installed bearing, eliminating a concern on rusting of components used, and avoiding serious effect on the bearing even when mortar and other materials undergoes creeping.SOLUTION: A bearing installation method of the present invention includes at least a bearing installation step, a height adjustment step, an injection step and a bolt extraction step. In the bearing installation step, a bearing is installed by mounting a bottom end of a height adjustment bolt on a blockout part disposed at a position to install the bearing, on a lower foundation that supports the bearing. In the height adjustment step, the height adjustment bolt is rotated for adjusting a bearing installation height. In the injection step, a filler is injected into the blockout part. In the bolt extraction step, the height adjustment bolt is extracted after the filler reaches a prescribed strength.
【課題】本願発明の課題は、従来の問題を解決することであり、すなわち、設置後の支承の高さ調整が容易であり、使用部材の発錆の懸念がなく、しかもモルタル等がクリープしても支承に大きな影響を与えることのない、支承設置方法、及び支承構造を提供することである。【解決手段】本願発明の支承設置方法は、少なくとも支承設置工程と、高さ調整工程、注入工程、ボルト抜き取り工程を備えた方法である。支承設置工程では、支承を支持する下部基礎のうち、支承を設置する位置に設けられた箱抜き部に、高さ調整ボルトの下端を載せることで、支承の設置が行われる。高さ調整工程では、高さ調整ボルトを回転させることで支承の設置高さの調整が行われる。注入工程では、箱抜き部に充填材が注入され、ボルト抜き取り工程では、充填材が所定強度に達するまで待ったうえで高さ調整ボルトが抜き取られる。【選択図】図3
BEARING INSTALLATION METHOD AND BEARING STRUCTURE
PROBLEM TO BE SOLVED: To provide a bearing installation method and a bearing structure for solving conventional problems, specifically, facilitating height adjustment of an installed bearing, eliminating a concern on rusting of components used, and avoiding serious effect on the bearing even when mortar and other materials undergoes creeping.SOLUTION: A bearing installation method of the present invention includes at least a bearing installation step, a height adjustment step, an injection step and a bolt extraction step. In the bearing installation step, a bearing is installed by mounting a bottom end of a height adjustment bolt on a blockout part disposed at a position to install the bearing, on a lower foundation that supports the bearing. In the height adjustment step, the height adjustment bolt is rotated for adjusting a bearing installation height. In the injection step, a filler is injected into the blockout part. In the bolt extraction step, the height adjustment bolt is extracted after the filler reaches a prescribed strength.
【課題】本願発明の課題は、従来の問題を解決することであり、すなわち、設置後の支承の高さ調整が容易であり、使用部材の発錆の懸念がなく、しかもモルタル等がクリープしても支承に大きな影響を与えることのない、支承設置方法、及び支承構造を提供することである。【解決手段】本願発明の支承設置方法は、少なくとも支承設置工程と、高さ調整工程、注入工程、ボルト抜き取り工程を備えた方法である。支承設置工程では、支承を支持する下部基礎のうち、支承を設置する位置に設けられた箱抜き部に、高さ調整ボルトの下端を載せることで、支承の設置が行われる。高さ調整工程では、高さ調整ボルトを回転させることで支承の設置高さの調整が行われる。注入工程では、箱抜き部に充填材が注入され、ボルト抜き取り工程では、充填材が所定強度に達するまで待ったうえで高さ調整ボルトが抜き取られる。【選択図】図3
BEARING INSTALLATION METHOD AND BEARING STRUCTURE
支承設置方法、及び支承構造
FUKUDA MASATSUGU (Autor:in) / SHIROMIZU AKIO (Autor:in)
18.01.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
BEARING DEVICE INSTALLATION METHOD AND BEARING DEVICE
Europäisches Patentamt | 2016
|Protective Cover Structure and Installation Method for Bridge Bearing
Europäisches Patentamt | 2025
BEARING WALL INSTALLATION STRUCTURE IN STEEL FRAME BUILDING STRUCTURE
Europäisches Patentamt | 2015
|Installation method of prefabricated non-bearing wall
Europäisches Patentamt | 2020
|