EARTHQUAKE-RESISTANT MANHOLE REPAIR METHOD
PROBLEM TO BE SOLVED: To provide an earthquake-resistant manhole repair method capable of absorbing a stress exerted by an earthquake on a manhole, eliminating a need to increase a repair layer thickness and minimizing narrowing of a space after repair.SOLUTION: An earthquake-resistant manhole repair method is for a manhole 1 having concrete side lumps 2 and 2 laminated. After removing a deteriorated concrete layer on an inner peripheral side entirely along the circumference, a repair layer 6 is formed by applying or casting a resin-based or cement-based repair material 5 on a concrete surface after removing the deteriorated layer, in such a way as to have a separation gap 4 of a prescribed width formed in a ring-form along and over a connecting part 3 between the laminated concrete side lumps 2 and 2. Then, an elastic adhesive 10 is filled into the separation gap 4 formed in the repair layer 6, for forming an elastic adhesive layer 11.SELECTED DRAWING: Figure 1
【課題】地震により人孔へ加わる応力を吸収できるようにすることにより、補修層の肉厚を厚くしないで済むようにし、補修後の空間縮小を極力抑えられるようにする地震対応人孔補修工法を提供する。【解決手段】コンクリート側塊2、2を積層した構造の人孔1における地震対応人孔補修工法であって、内周側のコンクリートの劣化層を全周に渡って除去し、劣化層除去後のコンクリート面に、積層されたコンクリート側塊2、2の接合部3を跨ぐ所定の幅の縁切り隙間4を接合部3に沿ってリング状に形成するように、樹脂系やセメント系の補修材5を塗布或いは打設して補修層6を形成し、補修層6に形成した縁切り隙間4に弾性接着剤10を充填して弾性接着剤層11を形成する。【選択図】図1
EARTHQUAKE-RESISTANT MANHOLE REPAIR METHOD
PROBLEM TO BE SOLVED: To provide an earthquake-resistant manhole repair method capable of absorbing a stress exerted by an earthquake on a manhole, eliminating a need to increase a repair layer thickness and minimizing narrowing of a space after repair.SOLUTION: An earthquake-resistant manhole repair method is for a manhole 1 having concrete side lumps 2 and 2 laminated. After removing a deteriorated concrete layer on an inner peripheral side entirely along the circumference, a repair layer 6 is formed by applying or casting a resin-based or cement-based repair material 5 on a concrete surface after removing the deteriorated layer, in such a way as to have a separation gap 4 of a prescribed width formed in a ring-form along and over a connecting part 3 between the laminated concrete side lumps 2 and 2. Then, an elastic adhesive 10 is filled into the separation gap 4 formed in the repair layer 6, for forming an elastic adhesive layer 11.SELECTED DRAWING: Figure 1
【課題】地震により人孔へ加わる応力を吸収できるようにすることにより、補修層の肉厚を厚くしないで済むようにし、補修後の空間縮小を極力抑えられるようにする地震対応人孔補修工法を提供する。【解決手段】コンクリート側塊2、2を積層した構造の人孔1における地震対応人孔補修工法であって、内周側のコンクリートの劣化層を全周に渡って除去し、劣化層除去後のコンクリート面に、積層されたコンクリート側塊2、2の接合部3を跨ぐ所定の幅の縁切り隙間4を接合部3に沿ってリング状に形成するように、樹脂系やセメント系の補修材5を塗布或いは打設して補修層6を形成し、補修層6に形成した縁切り隙間4に弾性接着剤10を充填して弾性接着剤層11を形成する。【選択図】図1
EARTHQUAKE-RESISTANT MANHOLE REPAIR METHOD
地震対応人孔補修工法
IMAZAKI YUJI (Autor:in) / IIJIMA YUTAKA (Autor:in) / HAYASHI ETSURO (Autor:in) / IIDA KAZUKI (Autor:in) / NAKANO MASAAKI (Autor:in)
07.03.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,