Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ANCHOR GEAR AND INSTALLATION METHOD THEREOF
PROBLEM TO BE SOLVED: To provide an anchor gear and an anchor gear installation method capable of reducing a transportation space, promoting weight saving, and definitely obtaining a planned bearing capacity.SOLUTION: An anchor gear 100 comprises: anchor bodies 10a, 10b, which are separately driven into a foundation; a pressure plate 20, which connects the anchor bodies and is driven into the foundation; and caps 30a, 30b, which are placed on head parts of the anchor bodies. Both ends of a first wire are connected to the head parts of the anchor bodies 10a, 10b. A second wire is connected at a center of the first wire through a shackle. The pressure plate 20 has an engaging projection on each side edge of a rectangular pressure face 21. Side edges of the pressure face 21 enter engagement slits formed on the anchor bodies 10a, 10b, respectively, and the engaging projection is undetachably engaged to the slit.SELECTED DRAWING: Figure 1
【課題】搬送スペースを減少すると共に、軽量化を促進し、しかも、予定した支持力を確実に得ることができるアンカー装置およびアンカー装置の設置方法を提供する。【解決手段】アンカー装置100は、それぞれ別個に地盤に打ち込まれるアンカー本体10a、10bと、両者を連結した状態で地盤に打ち込まれる受圧板20と、その頭部に設置されるキャップ30a、30bとを有し、アンカー本体10a、10bの頭部に第1ワイヤーの両端が連結され、第1ワイヤーの中央でシャックルを介して第2ワイヤーが連結される。受圧板20は、矩形状の受圧面21の両側縁に設けられた係止用突起を具備し、アンカー本体10a、10bに形成された係止用スリットのそれぞれに、受圧面21の側縁が侵入し、係止用突起が抜け出し不可能に係止する。【選択図】図1
ANCHOR GEAR AND INSTALLATION METHOD THEREOF
PROBLEM TO BE SOLVED: To provide an anchor gear and an anchor gear installation method capable of reducing a transportation space, promoting weight saving, and definitely obtaining a planned bearing capacity.SOLUTION: An anchor gear 100 comprises: anchor bodies 10a, 10b, which are separately driven into a foundation; a pressure plate 20, which connects the anchor bodies and is driven into the foundation; and caps 30a, 30b, which are placed on head parts of the anchor bodies. Both ends of a first wire are connected to the head parts of the anchor bodies 10a, 10b. A second wire is connected at a center of the first wire through a shackle. The pressure plate 20 has an engaging projection on each side edge of a rectangular pressure face 21. Side edges of the pressure face 21 enter engagement slits formed on the anchor bodies 10a, 10b, respectively, and the engaging projection is undetachably engaged to the slit.SELECTED DRAWING: Figure 1
【課題】搬送スペースを減少すると共に、軽量化を促進し、しかも、予定した支持力を確実に得ることができるアンカー装置およびアンカー装置の設置方法を提供する。【解決手段】アンカー装置100は、それぞれ別個に地盤に打ち込まれるアンカー本体10a、10bと、両者を連結した状態で地盤に打ち込まれる受圧板20と、その頭部に設置されるキャップ30a、30bとを有し、アンカー本体10a、10bの頭部に第1ワイヤーの両端が連結され、第1ワイヤーの中央でシャックルを介して第2ワイヤーが連結される。受圧板20は、矩形状の受圧面21の両側縁に設けられた係止用突起を具備し、アンカー本体10a、10bに形成された係止用スリットのそれぞれに、受圧面21の側縁が侵入し、係止用突起が抜け出し不可能に係止する。【選択図】図1
ANCHOR GEAR AND INSTALLATION METHOD THEREOF
アンカー装置およびアンカー装置の設置方法
TSURUMI AKITOSHI (Autor:in) / ASAI NOBUHIDE (Autor:in) / KAMAZAKI YUJI (Autor:in) / KOMURO YOSHIHIRO (Autor:in) / NOZAKI YUSUKE (Autor:in)
30.05.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
ANCHOR PIN, INSTALLATION METHOD THEREOF AND ANCHOR PIN INSTALLATION STRUCTURE
Europäisches Patentamt | 2017
|POST-INSTALLATION ANCHOR AND INSTALLATION METHOD THEREOF
Europäisches Patentamt | 2022
|