ANCHOR GEAR AND CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To provide an anchor gear capable of being correctly installed without deforming or breaking a component and a construction method thereof.SOLUTION: An anchor gear 100 comprises: an anchor sleeve pipe 110 which is placed in a concavity 910 formed on a foundation 900; and an anchor body 120 which is driven into the foundation 900 surrounded by the anchor sleeve pipe 110. The anchor sleeve pipe 110 comprises: a north side plate and a south side plate 10s; an east upper connecting material 14e which connects the north side plate and the south side plate and has an upper guide projection; a west connecting material 14w with the upper guide projection; an east lower connecting material 15e with a lower guide projection; and a west lower connecting material 15w with a lower guide projection. The anchor body 120 comprises: a steel pipe 70; and anchor blades 80e, 80w which are installed on the steel pipe 70 and face to each other. The anchor blades 80e, 80w are guided by the upper guide projection and the lower guide projection.SELECTED DRAWING: Figure 1
【課題】部材を変形や破損することなく、正確に設置することができるアンカー装置およびアンカー装置の施工方法を提供する。【解決手段】アンカー装置100は、地盤900に形成された凹部910に載置されるアンカー鞘管110と、これに包囲された地盤900に打ち込まれるアンカー本体120とを有し、アンカー鞘管110は、北側板および南側板10sと、これらを連結し、上ガイド突起を具備する東上連結材14e、上ガイド突起を具備する西上連結材14w、下ガイド突起を具備する東下連結材15e、および下ガイド突起を具備する西下連結材15wとを具備し、アンカー本体120は、鋼管70と、鋼管70に設置された対向したアンカー羽根80e、80wとを具備し、アンカー羽根80e、80wは上ガイド突起および下ガイド突起に案内される。【選択図】図1
ANCHOR GEAR AND CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To provide an anchor gear capable of being correctly installed without deforming or breaking a component and a construction method thereof.SOLUTION: An anchor gear 100 comprises: an anchor sleeve pipe 110 which is placed in a concavity 910 formed on a foundation 900; and an anchor body 120 which is driven into the foundation 900 surrounded by the anchor sleeve pipe 110. The anchor sleeve pipe 110 comprises: a north side plate and a south side plate 10s; an east upper connecting material 14e which connects the north side plate and the south side plate and has an upper guide projection; a west connecting material 14w with the upper guide projection; an east lower connecting material 15e with a lower guide projection; and a west lower connecting material 15w with a lower guide projection. The anchor body 120 comprises: a steel pipe 70; and anchor blades 80e, 80w which are installed on the steel pipe 70 and face to each other. The anchor blades 80e, 80w are guided by the upper guide projection and the lower guide projection.SELECTED DRAWING: Figure 1
【課題】部材を変形や破損することなく、正確に設置することができるアンカー装置およびアンカー装置の施工方法を提供する。【解決手段】アンカー装置100は、地盤900に形成された凹部910に載置されるアンカー鞘管110と、これに包囲された地盤900に打ち込まれるアンカー本体120とを有し、アンカー鞘管110は、北側板および南側板10sと、これらを連結し、上ガイド突起を具備する東上連結材14e、上ガイド突起を具備する西上連結材14w、下ガイド突起を具備する東下連結材15e、および下ガイド突起を具備する西下連結材15wとを具備し、アンカー本体120は、鋼管70と、鋼管70に設置された対向したアンカー羽根80e、80wとを具備し、アンカー羽根80e、80wは上ガイド突起および下ガイド突起に案内される。【選択図】図1
ANCHOR GEAR AND CONSTRUCTION METHOD THEREOF
アンカー装置およびアンカー装置の施工方法
TSURUMI AKITOSHI (Autor:in) / ASAI NOBUHIDE (Autor:in) / KAMAZAKI YUJI (Autor:in) / KOMURO YOSHIHIRO (Autor:in) / NOZAKI YUSUKE (Autor:in)
30.05.2016
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
ANCHOR, ANCHOR CONSTRUCTION TOOL AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2017
|ANCHOR CONSTRUCTION METHOD, ANCHOR SYSTEM, ANCHOR CONSTRUCTION TOOL, AND ANCHOR
Europäisches Patentamt | 2019
|ANCHOR, ANCHOR CONSTRUCTION TOOL AND ANCHOR CONSTRUCTION METHOD
Europäisches Patentamt | 2017
|