CONSTRUCTION METHOD OF WOODEN BUILDING AND FOUNDATION MEMBER USED FOR CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a construction method of a wooden building capable of shortening a construction period before starting raising a framework and enhancing a degree of freedom in the construction period of a rising foundation part, and to provide a foundation member.SOLUTION: A construction method of a wooden building includes: a foundation bar arrangement step of arranging bottom plate bars 51 and rising foundation bars 53; a buried base installation step of installing support body base parts 16; a base plate forming step of forming a base plate 17 by burying lower parts of the rising foundation bars 53, the support body base parts 16, and the bottom plate bars 51; a base plate curing step until the base plate 17 is solidified; a support body installation step of connecting a support body main body 18 to each support body base part 16 after curing and erecting the same; a groundsill laying step of laying groundsill 37 above the support body main bodies 18; a vertical support part installation step of installing vertical support members between the groundsill 37 and the base plate 17; a step of installing a rising foundation form that surrounds the rising foundation bars 53, the support body main bodies 18 and a vertical support members 23; a framework raising step performed utilizing the groundsill 37; and a step, performed in parallel with the framework raising step, of charging concrete in the rising foundation form to form a rising foundation part.SELECTED DRAWING: Figure 5
【課題】上棟開始までの工期を短縮でき、基礎立上り部の工期自由度を高めることができる木造建築物の施工方法及び基礎部材を提供する。【解決手段】底盤用配筋51と基礎立上り用配筋53を配筋する基礎配筋工程と、支持体基部16を設置する埋設基部設置工程と、基礎立上り用配筋53下部と支持体基部16、底盤用配筋51を埋設し底盤17を形成する底盤形成工程と、底盤17が固化するまでの底盤養生工程と、養生後に支持体基部16に連結し支持体本体18を立設させる支持体設置工程と、支持体本体18上部に土台37を敷く土台敷工程と、土台37と底盤17との間に介設する鉛直支持部設置工程と、基礎立上り用配筋53と支持体本体18と鉛直支持部材23を囲う基礎立上り用型枠を設置する工程と、土台37を利用して行う上棟工程と、上棟工程に並行して基礎立上り用型枠にコンクリートを充填して基礎立上り部を形成する工程と、を含む。【選択図】 図5
CONSTRUCTION METHOD OF WOODEN BUILDING AND FOUNDATION MEMBER USED FOR CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a construction method of a wooden building capable of shortening a construction period before starting raising a framework and enhancing a degree of freedom in the construction period of a rising foundation part, and to provide a foundation member.SOLUTION: A construction method of a wooden building includes: a foundation bar arrangement step of arranging bottom plate bars 51 and rising foundation bars 53; a buried base installation step of installing support body base parts 16; a base plate forming step of forming a base plate 17 by burying lower parts of the rising foundation bars 53, the support body base parts 16, and the bottom plate bars 51; a base plate curing step until the base plate 17 is solidified; a support body installation step of connecting a support body main body 18 to each support body base part 16 after curing and erecting the same; a groundsill laying step of laying groundsill 37 above the support body main bodies 18; a vertical support part installation step of installing vertical support members between the groundsill 37 and the base plate 17; a step of installing a rising foundation form that surrounds the rising foundation bars 53, the support body main bodies 18 and a vertical support members 23; a framework raising step performed utilizing the groundsill 37; and a step, performed in parallel with the framework raising step, of charging concrete in the rising foundation form to form a rising foundation part.SELECTED DRAWING: Figure 5
【課題】上棟開始までの工期を短縮でき、基礎立上り部の工期自由度を高めることができる木造建築物の施工方法及び基礎部材を提供する。【解決手段】底盤用配筋51と基礎立上り用配筋53を配筋する基礎配筋工程と、支持体基部16を設置する埋設基部設置工程と、基礎立上り用配筋53下部と支持体基部16、底盤用配筋51を埋設し底盤17を形成する底盤形成工程と、底盤17が固化するまでの底盤養生工程と、養生後に支持体基部16に連結し支持体本体18を立設させる支持体設置工程と、支持体本体18上部に土台37を敷く土台敷工程と、土台37と底盤17との間に介設する鉛直支持部設置工程と、基礎立上り用配筋53と支持体本体18と鉛直支持部材23を囲う基礎立上り用型枠を設置する工程と、土台37を利用して行う上棟工程と、上棟工程に並行して基礎立上り用型枠にコンクリートを充填して基礎立上り部を形成する工程と、を含む。【選択図】 図5
CONSTRUCTION METHOD OF WOODEN BUILDING AND FOUNDATION MEMBER USED FOR CONSTRUCTION METHOD
木造建築物の施工方法及び該施工方法に用いる基礎部材
KAMIHIRO FUTOSHI (Autor:in) / HARADA NAOKI (Autor:in) / TACHIBANA KAZUKI (Autor:in)
25.08.2016
Patent
Elektronische Ressource
Japanisch