Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SLOPE STRUCTURE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a slope structure construction method capable of constructing a slope structure efficiently in a short time.SOLUTION: A slope structure construction method includes: a support metal fitting fixing process of fixing a plurality of support metal fittings 70 horizontally at intervals at positions near the upper ends of a plurality of protective panels 30 provided in parallel; a single pipe installation process of connecting a plurality of single pipes 71 along the upper ends of the protective panels 30, bridging the support metal fittings 70, and fixing the pipes; a bracket scaffold temporary-installation process of hooking and locking a plurality of scaffold brackets 72 on the connected single pipes 71 before making scaffold boards 73 bridge the scaffold brackets 72 to temporarily install a bracket scaffold 7; a mold installation process of using the bracket scaffold 7 to install a mold extending upwards along the upper ends of the protective panel 30; and a top end concrete installation process of installing concrete inside the mold in order to construct top end concrete 5 for protecting the top end of a filler 2 against erosion caused by rainwater.SELECTED DRAWING: Figure 17
【課題】短時間で効率よく斜面構造物を構築することが可能な斜面構造物の構築方法を提供する。【解決手段】斜面構造物の構築方法において、並設された複数の保護パネル30の上端付近に横方向に間隔をあけて複数の支持金具70を固定する支持金具固定工程と、保護パネル30の上端に沿って複数の単管パイプ71を連接して支持金具70間に架け渡して固定する単管パイプ架設工程と、連接した単管パイプ71に複数の足場ブラケット72を掛け止めるとともに、これらの足場ブラケット72間に足場板73を架け渡してブラケット足場7を仮設するブラケット足場仮設工程と、このブラケット足場7を利用して保護パネル30の上端に沿って上方へ延伸する型枠を設置する型枠設置工程と、充填材2の天端を雨水の浸食から保護する天端コンクリート5を構築するために前記型枠内にコンクリートを打設する天端コンクリート打設工程と、を行う。【選択図】図17
SLOPE STRUCTURE CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide a slope structure construction method capable of constructing a slope structure efficiently in a short time.SOLUTION: A slope structure construction method includes: a support metal fitting fixing process of fixing a plurality of support metal fittings 70 horizontally at intervals at positions near the upper ends of a plurality of protective panels 30 provided in parallel; a single pipe installation process of connecting a plurality of single pipes 71 along the upper ends of the protective panels 30, bridging the support metal fittings 70, and fixing the pipes; a bracket scaffold temporary-installation process of hooking and locking a plurality of scaffold brackets 72 on the connected single pipes 71 before making scaffold boards 73 bridge the scaffold brackets 72 to temporarily install a bracket scaffold 7; a mold installation process of using the bracket scaffold 7 to install a mold extending upwards along the upper ends of the protective panel 30; and a top end concrete installation process of installing concrete inside the mold in order to construct top end concrete 5 for protecting the top end of a filler 2 against erosion caused by rainwater.SELECTED DRAWING: Figure 17
【課題】短時間で効率よく斜面構造物を構築することが可能な斜面構造物の構築方法を提供する。【解決手段】斜面構造物の構築方法において、並設された複数の保護パネル30の上端付近に横方向に間隔をあけて複数の支持金具70を固定する支持金具固定工程と、保護パネル30の上端に沿って複数の単管パイプ71を連接して支持金具70間に架け渡して固定する単管パイプ架設工程と、連接した単管パイプ71に複数の足場ブラケット72を掛け止めるとともに、これらの足場ブラケット72間に足場板73を架け渡してブラケット足場7を仮設するブラケット足場仮設工程と、このブラケット足場7を利用して保護パネル30の上端に沿って上方へ延伸する型枠を設置する型枠設置工程と、充填材2の天端を雨水の浸食から保護する天端コンクリート5を構築するために前記型枠内にコンクリートを打設する天端コンクリート打設工程と、を行う。【選択図】図17
SLOPE STRUCTURE CONSTRUCTION METHOD
斜面構造物の構築方法
KOBAYASHI HISAO (Autor:in) / TSUTSUI TOMOTERU (Autor:in) / CHIHARA MAKOTO (Autor:in) / OMURA YOSHIMASA (Autor:in) / WATANABE YUSUKE (Autor:in) / OSUMI HISASHI (Autor:in)
10.11.2016
Patent
Elektronische Ressource
Japanisch
Side slope structure and side slope construction method
Europäisches Patentamt | 2024
|Slope combination reinforcing structure and slope reinforcing construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Half-slope pile supporting structure construction method for slope filling
Europäisches Patentamt | 2023
|