Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD FOR SLOPE STRUCTURE
PROBLEM TO BE SOLVED: To provide a construction method for a slope structure enables the slope structure to be constructed in a short period of time by eliminating burdensome work such as installation of a filling concrete mold, at the same time reducing material costs and therefore reducing construction costs.SOLUTION: A construction method for a slope structure (an erosion control weir 1') is for constructing a structure having a slope by forming a slope surface (an upstream-side slope body 3) by laying a plurality of protective panels 30 next to each other, and filling a filler material 2 inside the protective panel 30 that forms the slope. The construction method for the slope structure includes the following steps: a wire net cutting step in which a wire net 6 is cut to suit a gap space Y formed on an outer side of the slope between a side edge X at each tier of the protective panel 30 laid in tiers and a ground G on which the erosion control weir 1' is to be installed; a wire net erection step in which the cut wire net 6 is erected in a direction almost orthogonal to the slope surface at the side edge X; and an out-of-the-slope-surface filling step in which an external filler material 2' is filled in a part outside of the slope surface to the wire net 6 that has been erected.SELECTED DRAWING: Figure 14
【課題】間詰めコンクリートの型枠設置等の手間のかかる作業を省略して短期間で斜面構造物を構築することができ、且つ、材料費を低減して築造コストを削減することができる斜面構造物の構築方法を提供する。【解決手段】複数の保護パネル30を並設して斜面(上流側斜面体3)を形成するとともに、その斜面を形成する保護パネル30内に充填材2を充填して斜面を有する構造物を構築する斜面構造物(砂防堰堤1’)の構築方法において、段状に並設された保護パネル30の各段の側端Xと砂防堰堤1’を設置する地山Gとの間の斜面外側に形成される隙間空間Yに合わせて金網6を切断する金網切断工程と、切断した金網6を側端Xにおいて前記斜面と略直交する方向に立設する金網立設工程と、立設した金網6まで前記斜面の外側に外部充填材2’を充填する斜面外部充填工程と、を行う。【選択図】図14
CONSTRUCTION METHOD FOR SLOPE STRUCTURE
PROBLEM TO BE SOLVED: To provide a construction method for a slope structure enables the slope structure to be constructed in a short period of time by eliminating burdensome work such as installation of a filling concrete mold, at the same time reducing material costs and therefore reducing construction costs.SOLUTION: A construction method for a slope structure (an erosion control weir 1') is for constructing a structure having a slope by forming a slope surface (an upstream-side slope body 3) by laying a plurality of protective panels 30 next to each other, and filling a filler material 2 inside the protective panel 30 that forms the slope. The construction method for the slope structure includes the following steps: a wire net cutting step in which a wire net 6 is cut to suit a gap space Y formed on an outer side of the slope between a side edge X at each tier of the protective panel 30 laid in tiers and a ground G on which the erosion control weir 1' is to be installed; a wire net erection step in which the cut wire net 6 is erected in a direction almost orthogonal to the slope surface at the side edge X; and an out-of-the-slope-surface filling step in which an external filler material 2' is filled in a part outside of the slope surface to the wire net 6 that has been erected.SELECTED DRAWING: Figure 14
【課題】間詰めコンクリートの型枠設置等の手間のかかる作業を省略して短期間で斜面構造物を構築することができ、且つ、材料費を低減して築造コストを削減することができる斜面構造物の構築方法を提供する。【解決手段】複数の保護パネル30を並設して斜面(上流側斜面体3)を形成するとともに、その斜面を形成する保護パネル30内に充填材2を充填して斜面を有する構造物を構築する斜面構造物(砂防堰堤1’)の構築方法において、段状に並設された保護パネル30の各段の側端Xと砂防堰堤1’を設置する地山Gとの間の斜面外側に形成される隙間空間Yに合わせて金網6を切断する金網切断工程と、切断した金網6を側端Xにおいて前記斜面と略直交する方向に立設する金網立設工程と、立設した金網6まで前記斜面の外側に外部充填材2’を充填する斜面外部充填工程と、を行う。【選択図】図14
CONSTRUCTION METHOD FOR SLOPE STRUCTURE
斜面構造物の構築方法
KOBAYASHI HISAO (Autor:in) / OSUMI HISASHI (Autor:in)
10.11.2016
Patent
Elektronische Ressource
Japanisch
Side slope structure and side slope construction method
Europäisches Patentamt | 2024
|Slope combination reinforcing structure and slope reinforcing construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Half-slope pile supporting structure construction method for slope filling
Europäisches Patentamt | 2023
|