Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BRANCHED PIPING STRUCTURE
PROBLEM TO BE SOLVED: To provide a branched piping structure that suppresses separation among materials of concrete, while suppressing wear inside the piping at the branched portion caused by pumped concrete.SOLUTION: A branched piping structure S has a bottom part of an upper pipe 1 connected with a top part of a first lower pipe 21 with a shaft center of the pipes deviated from each other, and the bottom part of the upper pipe 1 connected with a top part of a second lower pipe 22 with a shaft center of the pipes deviated from each other. A communicating port 6 that communicates an inner space of the upper pipe 1 with an inner space of the first lower pipe 21 is formed at a part where the bottom part of the upper pipe 1 and the top part of the first lower pipe 21 are overlapped. Furthermore, the communicating port 6 that communicates the inner space of the upper pipe 1 with an inner space of the second lower pipe 22 is formed at a part where the bottom part of the upper pipe 1 and the top part of the second lower pipe 22 are overlapped.SELECTED DRAWING: Figure 2
【課題】圧送されるコンクリートによって分岐部分の配管内部が摩耗するのを抑制しつつ、コンクリートの材料分離を抑制することができる分岐配管構造を提供する。【解決手段】上管1の下部と第一下管21の上部とを、互いの軸芯をずらした状態で重ね合せて連結し、かつ、上管1の下部と第二下管22の上部とを、互いの軸芯をずらした状態で重ね合せて連結してなる分岐配管構造Sであって、上管1の下部と第一下管21の上部とを重ね合わせた部分に上管1の内空と第一下管21の内空とを連通する連通口6が形成されており、上管1の下部と第二下管22の上部とを重ね合せた部分に上管1の内空と第二下管22の内空とを連通する連通口6が形成されている、ことを特徴としている。【選択図】図2
BRANCHED PIPING STRUCTURE
PROBLEM TO BE SOLVED: To provide a branched piping structure that suppresses separation among materials of concrete, while suppressing wear inside the piping at the branched portion caused by pumped concrete.SOLUTION: A branched piping structure S has a bottom part of an upper pipe 1 connected with a top part of a first lower pipe 21 with a shaft center of the pipes deviated from each other, and the bottom part of the upper pipe 1 connected with a top part of a second lower pipe 22 with a shaft center of the pipes deviated from each other. A communicating port 6 that communicates an inner space of the upper pipe 1 with an inner space of the first lower pipe 21 is formed at a part where the bottom part of the upper pipe 1 and the top part of the first lower pipe 21 are overlapped. Furthermore, the communicating port 6 that communicates the inner space of the upper pipe 1 with an inner space of the second lower pipe 22 is formed at a part where the bottom part of the upper pipe 1 and the top part of the second lower pipe 22 are overlapped.SELECTED DRAWING: Figure 2
【課題】圧送されるコンクリートによって分岐部分の配管内部が摩耗するのを抑制しつつ、コンクリートの材料分離を抑制することができる分岐配管構造を提供する。【解決手段】上管1の下部と第一下管21の上部とを、互いの軸芯をずらした状態で重ね合せて連結し、かつ、上管1の下部と第二下管22の上部とを、互いの軸芯をずらした状態で重ね合せて連結してなる分岐配管構造Sであって、上管1の下部と第一下管21の上部とを重ね合わせた部分に上管1の内空と第一下管21の内空とを連通する連通口6が形成されており、上管1の下部と第二下管22の上部とを重ね合せた部分に上管1の内空と第二下管22の内空とを連通する連通口6が形成されている、ことを特徴としている。【選択図】図2
BRANCHED PIPING STRUCTURE
分岐配管構造
NISHIDA YASUO (Autor:in) / KAWAMOTO TAKESHI (Autor:in) / MOROISHI TSUYOSHI (Autor:in) / TAKEDA SHINJI (Autor:in) / KADOWAKI NAOKI (Autor:in) / TSUNEMI MASAAKI (Autor:in) / SUETAKE SEIICHI (Autor:in) / HOSHINO AKIO (Autor:in)
24.11.2016
Patent
Elektronische Ressource
Japanisch