Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
TRUSS JOINING STRUCTURE
PROBLEM TO BE SOLVED: To provide a truss joining structure for efficiently executing work for installing a roof truss on an eaves girder.SOLUTION: In a truss joining structure, an installation member 2A fixed to a joining member 13 for joining the eaves side end of an upper chord member 11 and a lower chord member 12 of a roof truss 1, is installed on an eaves girder 4 by a bolt and nut 3 that is a fastening member, and the installation member 2A comprises a first vertical plate part 21 opposed to a vertical plate material 41 provided on the eaves girder 4 and a horizontal plate part 24 opposed to a horizontal plane part 42 of the eaves girder 4 positioned on the upper side of the vertical plate material 41, and the installation member 2A is fixed to the eaves girder 4 by the bolt and nut 3 provided by respectively penetrating through the first vertical plate part 21 and the horizontal plate part 24.SELECTED DRAWING: Figure 1
【課題】屋根トラスを軒桁に取り付ける作業が効率的に行えるトラス接合構造を提供する。【解決手段】屋根トラス1の上弦部材11と下弦部材12の軒側端を接合する接合部材13に固定されている取付部材2Aが締結部材であるボルト・ナット3によって軒桁4に取り付けられるトラス接合構造であって、上記取付部材2Aは上記軒桁4に設けられた鉛直板材41に対向する第1縦板部21と、上記鉛直板材41の上側に位置する軒桁4の水平面部42に対向する横板部24とを備えており、上記第1縦板部21および上記横板部24をそれぞれ貫通して設けられたボルト・ナット3によって上記取付部材2Aが上記軒桁4に固定される。【選択図】図1
TRUSS JOINING STRUCTURE
PROBLEM TO BE SOLVED: To provide a truss joining structure for efficiently executing work for installing a roof truss on an eaves girder.SOLUTION: In a truss joining structure, an installation member 2A fixed to a joining member 13 for joining the eaves side end of an upper chord member 11 and a lower chord member 12 of a roof truss 1, is installed on an eaves girder 4 by a bolt and nut 3 that is a fastening member, and the installation member 2A comprises a first vertical plate part 21 opposed to a vertical plate material 41 provided on the eaves girder 4 and a horizontal plate part 24 opposed to a horizontal plane part 42 of the eaves girder 4 positioned on the upper side of the vertical plate material 41, and the installation member 2A is fixed to the eaves girder 4 by the bolt and nut 3 provided by respectively penetrating through the first vertical plate part 21 and the horizontal plate part 24.SELECTED DRAWING: Figure 1
【課題】屋根トラスを軒桁に取り付ける作業が効率的に行えるトラス接合構造を提供する。【解決手段】屋根トラス1の上弦部材11と下弦部材12の軒側端を接合する接合部材13に固定されている取付部材2Aが締結部材であるボルト・ナット3によって軒桁4に取り付けられるトラス接合構造であって、上記取付部材2Aは上記軒桁4に設けられた鉛直板材41に対向する第1縦板部21と、上記鉛直板材41の上側に位置する軒桁4の水平面部42に対向する横板部24とを備えており、上記第1縦板部21および上記横板部24をそれぞれ貫通して設けられたボルト・ナット3によって上記取付部材2Aが上記軒桁4に固定される。【選択図】図1
TRUSS JOINING STRUCTURE
トラス接合構造
IMAHASHI YURINA (Autor:in) / MAEDA TAMAKI (Autor:in)
23.02.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Advanced Method for Leight-Weight Steel Truss Joining
British Library Conference Proceedings | 1998
|SYSTEMS, METHODS, AND MACHINES FOR JOINING TRUSS FOUNDATION COMPONENTS
Europäisches Patentamt | 2025
|