CONSTRUCTION METHOD OF RUBBLE FOUNDATION
PROBLEM TO BE SOLVED: To provide a construction method of a rubble foundation capable of efficiently executing a series of fairing work up to leveling work even when there is irregularity on the rubble foundation.SOLUTION: A construction method of a rubble foundation includes a depth measurement step of measuring the depth by contacting its leveling surface with a leveling range, by descending from above a sea in a state of closing a glove bucket 1, a height adjustment step of adjusting its height by inputting a stone material in the leveling range by the glove bucket 1 when being deeper than the predetermined depth, by excavating the leveling range by the glove bucket 1 when the measurement depth by the depth measurement step is shallower than the predetermined depth and a leveling step of leveling its leveling range by colliding its leveling surface with the leveling range in the state of closing the glove bucket 1 after the height adjustment step. Thus, even if there is irregularity on the rubble foundation 110, its fairing work can be efficiently executed.SELECTED DRAWING: Figure 8
【課題】捨石基礎上に凹凸がある場合でも、均し作業までの一連の整形作業を、効率的に行うことができる捨石基礎の施工方法を提供する。【解決手段】捨石基礎の施工方法は、グラブバケット1を閉じた状態で海上から降下させて、その均し面を均し範囲に接触させることで、深度を測定する深度測定ステップと、該深度測定ステップによる測定深度が所定深度よりも浅い場合には、グラブバケット1により均し範囲を掘削し、所定深度よりも深い場合には、グラブバケット1により均し範囲に石材を投入して、その高さを調整する高さ調整ステップと、該高さ調整ステップの後、グラブバケット1を閉じた状態でその均し面を、均し範囲に衝突させることでその均し範囲をならす均しステップと、を含む。これにより、捨石基礎110上に凹凸がある場合でも、その整形作業を、効率的に行うことができる。【選択図】図8
CONSTRUCTION METHOD OF RUBBLE FOUNDATION
PROBLEM TO BE SOLVED: To provide a construction method of a rubble foundation capable of efficiently executing a series of fairing work up to leveling work even when there is irregularity on the rubble foundation.SOLUTION: A construction method of a rubble foundation includes a depth measurement step of measuring the depth by contacting its leveling surface with a leveling range, by descending from above a sea in a state of closing a glove bucket 1, a height adjustment step of adjusting its height by inputting a stone material in the leveling range by the glove bucket 1 when being deeper than the predetermined depth, by excavating the leveling range by the glove bucket 1 when the measurement depth by the depth measurement step is shallower than the predetermined depth and a leveling step of leveling its leveling range by colliding its leveling surface with the leveling range in the state of closing the glove bucket 1 after the height adjustment step. Thus, even if there is irregularity on the rubble foundation 110, its fairing work can be efficiently executed.SELECTED DRAWING: Figure 8
【課題】捨石基礎上に凹凸がある場合でも、均し作業までの一連の整形作業を、効率的に行うことができる捨石基礎の施工方法を提供する。【解決手段】捨石基礎の施工方法は、グラブバケット1を閉じた状態で海上から降下させて、その均し面を均し範囲に接触させることで、深度を測定する深度測定ステップと、該深度測定ステップによる測定深度が所定深度よりも浅い場合には、グラブバケット1により均し範囲を掘削し、所定深度よりも深い場合には、グラブバケット1により均し範囲に石材を投入して、その高さを調整する高さ調整ステップと、該高さ調整ステップの後、グラブバケット1を閉じた状態でその均し面を、均し範囲に衝突させることでその均し範囲をならす均しステップと、を含む。これにより、捨石基礎110上に凹凸がある場合でも、その整形作業を、効率的に行うことができる。【選択図】図8
CONSTRUCTION METHOD OF RUBBLE FOUNDATION
捨石基礎の施工方法
TSUJIKITA SATOSHI (Autor:in) / AOYAMA TAKEMICHI (Autor:in)
18.05.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
RUBBLE MOUND CONSTRUCTION SYSTEM AND RUBBLE MOUND CONSTRUCTION METHOD
Europäisches Patentamt | 2021
|RUBBLE BASE CONSTRUCTION SYSTEM AND RUBBLE BASE CONSTRUCTION METHOD
Europäisches Patentamt | 2023
|Consolidation of Soft Foundation with Rubble
British Library Conference Proceedings | 1993
|