RUBBLE BASE CONSTRUCTION SYSTEM AND RUBBLE BASE CONSTRUCTION METHOD
To enable a rubble base adapted for design to be constructed even if a height of a weight is shorter than a length (depth) from the sea level to a top end surface of the rubble base.SOLUTION: A rubble base construction system drops a weight suspended from a wire of a crane of a floating crane ship on a rubble mound accumulated on the sea bottom to tamp the rubble mound. A height of the weight is shorter than a length from the sea level to a top end surface of the rubble mound. An altitude sensor is fitted to the wire of the crane. A fitting position of the altitude sensor is a place located above the sea level when a height of a bottom edge of the weight is aligned to a design height of the rubble mound. A crane control part controls a wire delivery amount of the crane based on an altitude sensed by the altitude sensor, adjusts a suspending height of the weight and drops the weight on the rubble mound.SELECTED DRAWING: Figure 1
【課題】その高さが、海面から捨石基礎の天端面までの長さ(深さ)よりも短い重錘であっても、設計に適合した捨石基礎を構築できる。【解決手段】捨石基礎構築システムは、起重機船のクレーンのワイヤに吊るされた重錘を、海底に堆積させた捨石マウンドに落下させて突き固める。重錘の高さは、海面から捨石マウンドの天端面までの長さよりも短い。クレーンのワイヤには、高度センサが取り付けられている。高度センサの取付位置は、重錘の下端の高さを、捨石マウンドの設計高さに合わせたときに、海面よりも上方に位置する場所である。クレーン制御部は、高度センサによってセンシングされた高度に基づき、クレーンのワイヤの繰出量を制御して重錘の吊り上げ高さを調整し、この重錘を捨石マウンドに落下させる。【選択図】図1
RUBBLE BASE CONSTRUCTION SYSTEM AND RUBBLE BASE CONSTRUCTION METHOD
To enable a rubble base adapted for design to be constructed even if a height of a weight is shorter than a length (depth) from the sea level to a top end surface of the rubble base.SOLUTION: A rubble base construction system drops a weight suspended from a wire of a crane of a floating crane ship on a rubble mound accumulated on the sea bottom to tamp the rubble mound. A height of the weight is shorter than a length from the sea level to a top end surface of the rubble mound. An altitude sensor is fitted to the wire of the crane. A fitting position of the altitude sensor is a place located above the sea level when a height of a bottom edge of the weight is aligned to a design height of the rubble mound. A crane control part controls a wire delivery amount of the crane based on an altitude sensed by the altitude sensor, adjusts a suspending height of the weight and drops the weight on the rubble mound.SELECTED DRAWING: Figure 1
【課題】その高さが、海面から捨石基礎の天端面までの長さ(深さ)よりも短い重錘であっても、設計に適合した捨石基礎を構築できる。【解決手段】捨石基礎構築システムは、起重機船のクレーンのワイヤに吊るされた重錘を、海底に堆積させた捨石マウンドに落下させて突き固める。重錘の高さは、海面から捨石マウンドの天端面までの長さよりも短い。クレーンのワイヤには、高度センサが取り付けられている。高度センサの取付位置は、重錘の下端の高さを、捨石マウンドの設計高さに合わせたときに、海面よりも上方に位置する場所である。クレーン制御部は、高度センサによってセンシングされた高度に基づき、クレーンのワイヤの繰出量を制御して重錘の吊り上げ高さを調整し、この重錘を捨石マウンドに落下させる。【選択図】図1
RUBBLE BASE CONSTRUCTION SYSTEM AND RUBBLE BASE CONSTRUCTION METHOD
捨石基礎構築システム、および捨石基礎構築方法
NODA MASAYUKI (Autor:in)
22.09.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
RUBBLE MOUND CONSTRUCTION SYSTEM AND RUBBLE MOUND CONSTRUCTION METHOD