METHOD FOR IMPROVING QUALITY OF SOIL IMPROVEMENT BODY FOR SOIL IMPROVEMENT WORK
PROBLEM TO BE SOLVED: To improve quality of a soil improvement body by avoiding problems such as a sludge blockage by efficiently and reliably discharging sludge water jetted out from inside ground, in soil improvement work.SOLUTION: A method for improving quality of a soil improvement body for soil improvement work includes the steps of: continuously sucking sludge water jetted out from inside ground in association with the soil improvement work and storing it by switching between at least two suction tanks 40; and transferring the sludge water, which is stored in the suction tanks 40, to a transfer tank car 70. Thus, the suction and storage of the sludge water can be continued by using either of the at least two suction tanks 40.SELECTED DRAWING: Figure 2
【課題】 地盤改良工事において、地盤中から噴出する排泥水を効率的かつ確実に排出することにより排泥閉塞等の不具合を回避して、地盤改良体の品質を向上させる。【解決手段】 地盤改良工事に伴い地盤中から噴出する排泥水を連続的に吸引して、少なくとも2機の吸引タンク40を切り替えて貯留する工程と、吸引タンク40に貯留した排泥水を移送タンク車70に移し替える工程とを含むことにより、少なくとも2機の吸引タンク40のうちのいずれか1機を用いて排泥水の吸引貯留を継続可能とする。【選択図】図2
METHOD FOR IMPROVING QUALITY OF SOIL IMPROVEMENT BODY FOR SOIL IMPROVEMENT WORK
PROBLEM TO BE SOLVED: To improve quality of a soil improvement body by avoiding problems such as a sludge blockage by efficiently and reliably discharging sludge water jetted out from inside ground, in soil improvement work.SOLUTION: A method for improving quality of a soil improvement body for soil improvement work includes the steps of: continuously sucking sludge water jetted out from inside ground in association with the soil improvement work and storing it by switching between at least two suction tanks 40; and transferring the sludge water, which is stored in the suction tanks 40, to a transfer tank car 70. Thus, the suction and storage of the sludge water can be continued by using either of the at least two suction tanks 40.SELECTED DRAWING: Figure 2
【課題】 地盤改良工事において、地盤中から噴出する排泥水を効率的かつ確実に排出することにより排泥閉塞等の不具合を回避して、地盤改良体の品質を向上させる。【解決手段】 地盤改良工事に伴い地盤中から噴出する排泥水を連続的に吸引して、少なくとも2機の吸引タンク40を切り替えて貯留する工程と、吸引タンク40に貯留した排泥水を移送タンク車70に移し替える工程とを含むことにより、少なくとも2機の吸引タンク40のうちのいずれか1機を用いて排泥水の吸引貯留を継続可能とする。【選択図】図2
METHOD FOR IMPROVING QUALITY OF SOIL IMPROVEMENT BODY FOR SOIL IMPROVEMENT WORK
地盤改良工事における地盤改良体の品質改良方法
TEZUKA HIROAKI (Autor:in) / YAMAUCHI TAKAHIRO (Autor:in) / KAWANISHI ATSUSHI (Autor:in)
18.05.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
SOIL IMPROVEMENT BODY CONSTRUCTION METHOD, SOIL IMPROVEMENT DEVICE, SOIL IMPROVEMENT BATHOLITH
Europäisches Patentamt | 2017
|SOIL IMPROVEMENT BODY AND SOIL IMPROVEMENT BODY CONSTRUCTION METHOD
Europäisches Patentamt | 2019
|SOIL IMPROVEMENT CEMENT COMPOSITION, SOIL IMPROVEMENT CONSTRUCTION METHOD AND SOIL IMPROVEMENT BODY
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|