Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BLOCK PAVEMENT STRUCTURE AND CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To restrain damage of a joint part.SOLUTION: A block pavement structure comprises a support layer 10 provided on a base 2 and a block layer 20 provided on the support layer 10, and the block layer 20 comprises a plurality of blocks 22 and 22 laid by opening a joint space 21, and the support layer 10 comprises an aggregate part 11 of laying-leveling an aggregate on the base 2, and fillers 12 and 23 of including special cement, a special asphalt emulsion and additional water are filled in an inter-aggregate cavity of the aggregate part 11 and the joint space 21, and the compounding ratio A of the special asphalt emulsion to the special cement in the filler 23 filled in the joint space 21, is larger than the compounding ratio B of the special asphalt emulsion to the special cement in the filler 12 filled in the inter-aggregate cavity.SELECTED DRAWING: Figure 1
【課題】目地部の破損を抑制する。【解決手段】基盤2上に設けられた支持層10と、支持層10上に設けられたブロック層20とを備えており、ブロック層20は、目地空間21をあけて敷設された複数のブロック22,22を備え、支持層10は、基盤2上に骨材を敷きならしてなる骨材部11を備えており、骨材部11の骨材間空隙および目地空間21には、特殊セメントと特殊アスファルト乳剤と添加水とを含有する充填材12,23が充填されており、目地空間21に充填された充填材23における特殊セメントに対する特殊アスファルト乳剤の配合比率Aは、骨材間空隙に充填された充填材12における特殊セメントに対する特殊アスファルト乳剤の配合比率Bよりも大きいことを特徴とする。【選択図】図1
BLOCK PAVEMENT STRUCTURE AND CONSTRUCTION METHOD THEREOF
PROBLEM TO BE SOLVED: To restrain damage of a joint part.SOLUTION: A block pavement structure comprises a support layer 10 provided on a base 2 and a block layer 20 provided on the support layer 10, and the block layer 20 comprises a plurality of blocks 22 and 22 laid by opening a joint space 21, and the support layer 10 comprises an aggregate part 11 of laying-leveling an aggregate on the base 2, and fillers 12 and 23 of including special cement, a special asphalt emulsion and additional water are filled in an inter-aggregate cavity of the aggregate part 11 and the joint space 21, and the compounding ratio A of the special asphalt emulsion to the special cement in the filler 23 filled in the joint space 21, is larger than the compounding ratio B of the special asphalt emulsion to the special cement in the filler 12 filled in the inter-aggregate cavity.SELECTED DRAWING: Figure 1
【課題】目地部の破損を抑制する。【解決手段】基盤2上に設けられた支持層10と、支持層10上に設けられたブロック層20とを備えており、ブロック層20は、目地空間21をあけて敷設された複数のブロック22,22を備え、支持層10は、基盤2上に骨材を敷きならしてなる骨材部11を備えており、骨材部11の骨材間空隙および目地空間21には、特殊セメントと特殊アスファルト乳剤と添加水とを含有する充填材12,23が充填されており、目地空間21に充填された充填材23における特殊セメントに対する特殊アスファルト乳剤の配合比率Aは、骨材間空隙に充填された充填材12における特殊セメントに対する特殊アスファルト乳剤の配合比率Bよりも大きいことを特徴とする。【選択図】図1
BLOCK PAVEMENT STRUCTURE AND CONSTRUCTION METHOD THEREOF
ブロック舗装構造およびその構築方法
KOSHIKAWA YOSHITAKA (Autor:in) / ITO FUMITAKA (Autor:in) / TSUJII TAKESHI (Autor:in)
25.05.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
BLOCK PAVEMENT STRUCTURE AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2020
|BLOCK PAVEMENT METHOD, BLOCK PAVEMENT STRUCTURE AND PAVEMENT BLOCK
Europäisches Patentamt | 2023
|BLOCK PAVEMENT METHOD, BLOCK PAVEMENT STRUCTURE, AND BLOCK PAVEMENT REINFORCEMENT PLATE
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|Modularized pavement plate pavement structure and construction method thereof
Europäisches Patentamt | 2021
|