Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
OVERHANG ERECTION METHOD
PROBLEM TO BE SOLVED: To provide an overhang erection method which can construct in a simple way overhangs narrowing a column head where movable work stages are placed.SOLUTION: An overhang erection method, which utilizes a first movable work stage 1A for constructing overhangs at one end 102A in the direction of the bridge axis of a column head 102 and a second movable work stage 1B for constructing overhangs at the other end 102B in the direction of the bridge axis of the column head 102, comprises: a first installation process in which the first movable work stage 1A is arranged on the 102A-end side of the column 102; and a second installation process in which, after the first installation process, a forward truss part 16 constituting the forward part of the second movable work stage 1B is arranged on the 102B-end side of the column head 102. The second installation process involves a connection process in which the forward truss part 16 is connected to the first movable work stage 1A using a link material 40.SELECTED DRAWING: Figure 2
【課題】簡易な方法によって、移動作業車を設置するための柱頭部を狭小化して張出施工することができる張出架設方法を提供する。【解決手段】柱頭部102の橋軸方向の一端102Aから張出施工を行う第1移動作業車1Aと、柱頭部102の橋軸方向の他端102Bから張出施工を行う第2移動作業車1Bと、を用いた張出架設方法において、柱頭部102の一端102A側に第1移動作業車1Aを設置する第1設置工程と、第1設置工程の後に、柱頭部102の他端102B側に第2移動作業車1Bの前方側の一部である前方トラス部16を設置する第2設置工程と、を備え、第2設置工程は、前方トラス部16を継材40によって第1移動作業車1Aに接続する接続工程を有する。【選択図】図2
OVERHANG ERECTION METHOD
PROBLEM TO BE SOLVED: To provide an overhang erection method which can construct in a simple way overhangs narrowing a column head where movable work stages are placed.SOLUTION: An overhang erection method, which utilizes a first movable work stage 1A for constructing overhangs at one end 102A in the direction of the bridge axis of a column head 102 and a second movable work stage 1B for constructing overhangs at the other end 102B in the direction of the bridge axis of the column head 102, comprises: a first installation process in which the first movable work stage 1A is arranged on the 102A-end side of the column 102; and a second installation process in which, after the first installation process, a forward truss part 16 constituting the forward part of the second movable work stage 1B is arranged on the 102B-end side of the column head 102. The second installation process involves a connection process in which the forward truss part 16 is connected to the first movable work stage 1A using a link material 40.SELECTED DRAWING: Figure 2
【課題】簡易な方法によって、移動作業車を設置するための柱頭部を狭小化して張出施工することができる張出架設方法を提供する。【解決手段】柱頭部102の橋軸方向の一端102Aから張出施工を行う第1移動作業車1Aと、柱頭部102の橋軸方向の他端102Bから張出施工を行う第2移動作業車1Bと、を用いた張出架設方法において、柱頭部102の一端102A側に第1移動作業車1Aを設置する第1設置工程と、第1設置工程の後に、柱頭部102の他端102B側に第2移動作業車1Bの前方側の一部である前方トラス部16を設置する第2設置工程と、を備え、第2設置工程は、前方トラス部16を継材40によって第1移動作業車1Aに接続する接続工程を有する。【選択図】図2
OVERHANG ERECTION METHOD
張出架設方法
KOBAYASHI TOSHIHARU (Autor:in) / SHIOZUKA SHOGO (Autor:in)
25.05.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
OVERHANG ERECTION WORK VEHICLE AND CONSTRUCTION METHOD
Europäisches Patentamt | 2019
|Stress state of metal dome meridional ribs at different stages of overhang erection process
DOAJ | 2020
|OVERHANG DOOR CONNECTION STRUCTURE IN COMPOUND OVERHANG DOOR
Europäisches Patentamt | 2021
|