OVERHANG CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an overhang installation method capable of narrowing a column head for installation of a mobile work vehicle so as to perform overhang construction.SOLUTION: The overhang installation method uses: a first mobile work vehicle 10 which performs overhang construction from one end 103a of a column head 103 in the X direction (bridge axial direction); and a second mobile work vehicle 20 which performs overhang construction from the other end 103b. The first mobile work vehicle 10 includes an upper support frame 11 which comprises a front frame 11b for supporting a bridge girder block B protruding forward in the advancing direction of the overhang construction above the column head 103 and overhung, and a rear frame 11c connected to the front frame 11b and fixed to an upper surface of the column head 103. The second mobile work vehicle 20 includes: a support portion 23 fixed to the upper surface; a main member 22 connected to the support portion 23 and extending from the upper side to the lower side of the column head 103; and a lower support frame 21 connected to the main member 22, projecting forward in the advancing direction of overhang construction below the column head 103 and supporting the bridge girder block B.SELECTED DRAWING: Figure 1
【課題】移動作業車を設置するための柱頭部を狭小化して張出施工することができる張出架設方法を提供する。【解決手段】張出架設方法は、柱頭部103のX方向(橋軸方向)の一端103aから張出施工を行う第1移動作業車10と、他端103bから張出施工を行う第2移動作業車20と、を用いる。第1移動作業車10は、柱頭部103の上方において張出施工の進行方向前方に張り出し、張出施工される橋桁ブロックBを支持する前方フレーム11bと、前方フレーム11bに連結され、柱頭部103の上面に固定される後方フレーム11cと、を有する上支えフレーム11を備える。第2移動作業車20は、上面に固定される支持部23と、支持部23に連結され、柱頭部103の上方から下方に亘って延びる主材22と、主材22に連結され、柱頭部103の下方において張出施工の進行方向前方に張り出し、橋桁ブロックBを支持する下支えフレーム21と、を備える。【選択図】図1
OVERHANG CONSTRUCTION METHOD
PROBLEM TO BE SOLVED: To provide an overhang installation method capable of narrowing a column head for installation of a mobile work vehicle so as to perform overhang construction.SOLUTION: The overhang installation method uses: a first mobile work vehicle 10 which performs overhang construction from one end 103a of a column head 103 in the X direction (bridge axial direction); and a second mobile work vehicle 20 which performs overhang construction from the other end 103b. The first mobile work vehicle 10 includes an upper support frame 11 which comprises a front frame 11b for supporting a bridge girder block B protruding forward in the advancing direction of the overhang construction above the column head 103 and overhung, and a rear frame 11c connected to the front frame 11b and fixed to an upper surface of the column head 103. The second mobile work vehicle 20 includes: a support portion 23 fixed to the upper surface; a main member 22 connected to the support portion 23 and extending from the upper side to the lower side of the column head 103; and a lower support frame 21 connected to the main member 22, projecting forward in the advancing direction of overhang construction below the column head 103 and supporting the bridge girder block B.SELECTED DRAWING: Figure 1
【課題】移動作業車を設置するための柱頭部を狭小化して張出施工することができる張出架設方法を提供する。【解決手段】張出架設方法は、柱頭部103のX方向(橋軸方向)の一端103aから張出施工を行う第1移動作業車10と、他端103bから張出施工を行う第2移動作業車20と、を用いる。第1移動作業車10は、柱頭部103の上方において張出施工の進行方向前方に張り出し、張出施工される橋桁ブロックBを支持する前方フレーム11bと、前方フレーム11bに連結され、柱頭部103の上面に固定される後方フレーム11cと、を有する上支えフレーム11を備える。第2移動作業車20は、上面に固定される支持部23と、支持部23に連結され、柱頭部103の上方から下方に亘って延びる主材22と、主材22に連結され、柱頭部103の下方において張出施工の進行方向前方に張り出し、橋桁ブロックBを支持する下支えフレーム21と、を備える。【選択図】図1
OVERHANG CONSTRUCTION METHOD
張出架設方法
UEDA AKIRO (Autor:in) / SHIOZUKA SHOGO (Autor:in) / YAMANAKA OAKI (Autor:in) / KAMEI YOSHIYUKI (Autor:in)
12.04.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
OVERHANG ERECTION WORK VEHICLE AND CONSTRUCTION METHOD
Europäisches Patentamt | 2019
|OVERHANG DOOR CONNECTION STRUCTURE IN COMPOUND OVERHANG DOOR
Europäisches Patentamt | 2021
|