Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
JUNCTION STRUCTURE OF FLOOR JOIST
PROBLEM TO BE SOLVED: To provide a junction structure of a floor joist in which the floor joist is temporarily supported to improve efficiency in lifting work while the number of components and processing labor are reduced.SOLUTION: A junction structure 1 of a floor joist according to the present invention is provided at a building, and includes a female member 4 that is attached to the floor joist 2 where a flange 21 and a web 24 are formed, and a male member 5 which is attached to a peripheral member 3 to which the floor joist 2 is jointed. The female member 4 is attached to an end part in a material shaft direction X of the floor joist 2 in such a manner as separated from the floor joist 2, to be extended in the material shaft direction X, so as to form a gap S together with the floor joist 2. The male member 5 is fixed to the floor joist 2 under such a condition as a tip end part 51 is pinched between the female member 4 and the floor joist 2, with the tip end part 51 which protrudes from the peripheral member 3 inserted in the gap S.SELECTED DRAWING: Figure 3
【課題】部品点数及び加工手間を低減しながら、床根太を仮支持して揚重作業の効率性を向上させた床根太の接合構造を提供する。【解決手段】本発明を適用した床根太の接合構造1は、建築物に設けられるものであり、フランジ21及びウェブ24が形成された床根太2に取り付けられる雌部材4と、床根太2が接合される周囲部材3に取り付けられる雄部材5とを備える。雌部材4は、床根太2の材軸方向Xの端部に、床根太2から離間させて材軸方向Xに延びるように取り付けられることで、床根太2との間に隙間Sが形成される。雄部材5は、周囲部材3から突出する先端部51が隙間Sに挿入されて、先端部51が雌部材4と床根太2とに挟まれた状態で床根太2に固定される。【選択図】図3
JUNCTION STRUCTURE OF FLOOR JOIST
PROBLEM TO BE SOLVED: To provide a junction structure of a floor joist in which the floor joist is temporarily supported to improve efficiency in lifting work while the number of components and processing labor are reduced.SOLUTION: A junction structure 1 of a floor joist according to the present invention is provided at a building, and includes a female member 4 that is attached to the floor joist 2 where a flange 21 and a web 24 are formed, and a male member 5 which is attached to a peripheral member 3 to which the floor joist 2 is jointed. The female member 4 is attached to an end part in a material shaft direction X of the floor joist 2 in such a manner as separated from the floor joist 2, to be extended in the material shaft direction X, so as to form a gap S together with the floor joist 2. The male member 5 is fixed to the floor joist 2 under such a condition as a tip end part 51 is pinched between the female member 4 and the floor joist 2, with the tip end part 51 which protrudes from the peripheral member 3 inserted in the gap S.SELECTED DRAWING: Figure 3
【課題】部品点数及び加工手間を低減しながら、床根太を仮支持して揚重作業の効率性を向上させた床根太の接合構造を提供する。【解決手段】本発明を適用した床根太の接合構造1は、建築物に設けられるものであり、フランジ21及びウェブ24が形成された床根太2に取り付けられる雌部材4と、床根太2が接合される周囲部材3に取り付けられる雄部材5とを備える。雌部材4は、床根太2の材軸方向Xの端部に、床根太2から離間させて材軸方向Xに延びるように取り付けられることで、床根太2との間に隙間Sが形成される。雄部材5は、周囲部材3から突出する先端部51が隙間Sに挿入されて、先端部51が雌部材4と床根太2とに挟まれた状態で床根太2に固定される。【選択図】図3
JUNCTION STRUCTURE OF FLOOR JOIST
床根太の接合構造
SHIMIZU NOBUTAKA (Autor:in) / KAWAI YOSHIMICHI (Autor:in) / AZUMA SEIZABURO (Autor:in) / NAKAYASU MASAAKI (Autor:in) / SATO KEIICHI (Autor:in) / SHISHIDO TADAKAZU (Autor:in)
22.06.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CONNECTION MEMBER AND JUNCTION STRUCTURE OF FLOOR JOIST
Europäisches Patentamt | 2017
|CONNECTION MEMBER AND JUNCTION STRUCTURE OF FLOOR JOIST
Europäisches Patentamt | 2017
|