INPUT MANAGEMENT METHOD AND INPUT MANAGEMENT DEVICE OF CAISSON INFILLING MATERIAL
PROBLEM TO BE SOLVED: To improve management accuracy of an input quantity of an infilling material of a caisson.SOLUTION: In a caisson 2 having a plurality of cells 4, an initial water level of the respective cells 4 is measured, and a post-input water level when an infilling material is inputted to the respective cells 4 is measured, and an input quantity of the infilling material inputted to the cells is managed based on a difference between the initial water level and the post-input water level of the respective cells 4. In a management process, the input quantity of the infilling material inputted to the cells 4 is calculated based on the difference between the initial water level and the post-input water level of the respective cells 4, and porosity of the infilling material.SELECTED DRAWING: Figure 1
【課題】ケーソンの中詰材の投入量の管理の精度を向上させること。【解決手段】複数の隔室4を有するケーソン2において、各々の前記隔室4の初期水位を計測し、各々の前記隔室4に中詰材が投入されたときの投入後水位を計測し、各々の前記隔室4の初期水位と投入後水位との差に基づいて、当該隔室に投入された中詰材の投入量を管理する。前記管理過程において、各々の前記隔室4の初期水位と投入後水位の差と、前記中詰材の間隙率とに基づいて、当該隔室4に投入された中詰材の投入量を算出する。【選択図】図1
INPUT MANAGEMENT METHOD AND INPUT MANAGEMENT DEVICE OF CAISSON INFILLING MATERIAL
PROBLEM TO BE SOLVED: To improve management accuracy of an input quantity of an infilling material of a caisson.SOLUTION: In a caisson 2 having a plurality of cells 4, an initial water level of the respective cells 4 is measured, and a post-input water level when an infilling material is inputted to the respective cells 4 is measured, and an input quantity of the infilling material inputted to the cells is managed based on a difference between the initial water level and the post-input water level of the respective cells 4. In a management process, the input quantity of the infilling material inputted to the cells 4 is calculated based on the difference between the initial water level and the post-input water level of the respective cells 4, and porosity of the infilling material.SELECTED DRAWING: Figure 1
【課題】ケーソンの中詰材の投入量の管理の精度を向上させること。【解決手段】複数の隔室4を有するケーソン2において、各々の前記隔室4の初期水位を計測し、各々の前記隔室4に中詰材が投入されたときの投入後水位を計測し、各々の前記隔室4の初期水位と投入後水位との差に基づいて、当該隔室に投入された中詰材の投入量を管理する。前記管理過程において、各々の前記隔室4の初期水位と投入後水位の差と、前記中詰材の間隙率とに基づいて、当該隔室4に投入された中詰材の投入量を算出する。【選択図】図1
INPUT MANAGEMENT METHOD AND INPUT MANAGEMENT DEVICE OF CAISSON INFILLING MATERIAL
ケーソン中詰材の投入管理方法及び投入管理装置
MANABE TAKUMI (Autor:in)
10.08.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
CAISSON CONSTRUCTION MANAGEMENT DEVICE AND CAISSON CONSTRUCTION METHOD
Europäisches Patentamt | 2017
|CAISSON IMMERSION MANAGEMENT SYSTEM AND CAISSON IMMERSION MANAGEMENT METHOD
Europäisches Patentamt | 2015
|CONSTRUCTION MANAGEMENT METHOD AND CONSTRUCTION MANAGEMENT DEVICE OF PNEUMATIC CAISSON
Europäisches Patentamt | 2023
|CONSTRUCTION MANAGEMENT METHOD AND CONSTRUCTION MANAGEMENT DEVICE FOR PNEUMATIC CAISSON
Europäisches Patentamt | 2021
|