Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ANCHOR REINFORCEMENT CONNECTION METAL FITTING
PROBLEM TO BE SOLVED: To provide an anchor reinforcement connection metal fitting capable of reducing cost by reducing tensile force of an anchor reinforcement, by improving installation work of the anchor reinforcement to a precast pile, without reducing joining force between the precast pile and foundation concrete.SOLUTION: In an anchor reinforcement connection metal fitting 1, six sleeves 3 are respectively fixed to a predetermined position of an outer peripheral surface of a pair of curved plates 21 in a state of separating in parallel to the axis of a cylindrical ring body 2 via a pair of sandwiching plates 27. The pair of sandwiching plates 27 are welded in a state of expanding toward the curved plate 21 side so as to become a V shape in a plan view. The cylindrical ring body 2 is inserted into an upper end part of a precast pile 10, and after fastening those by a bolt 25 and a nut 26, an anchor reinforcement 30 is fixed to the sleeves 3.SELECTED DRAWING: Figure 1
【課題】既製杭と基礎コンクリートとの間の結合力を低下させることなく、既製杭に対するアンカー鉄筋の取付作業を向上させることができ、アンカー鉄筋の引張力低減によりコストダウンが可能なアンカー鉄筋接続金具を提供する。【解決手段】アンカー鉄筋接続金具1は、一対の湾曲プレート21の外周面の所定位置に6個のスリーブ3がそれぞれ一対の挟持プレート27を介して円筒状リング体2の軸心と平行に離れた状態で固着される。一対の挟持プレート27は、平面視V字状となるように湾曲プレート21側に向けて広がった状態で溶接される。既製杭10の上端部に円筒状リング体2を挿入し、それらをボルト25とナット26で締め付けた後、アンカー鉄筋30をスリーブ3に固定する。【選択図】図1
ANCHOR REINFORCEMENT CONNECTION METAL FITTING
PROBLEM TO BE SOLVED: To provide an anchor reinforcement connection metal fitting capable of reducing cost by reducing tensile force of an anchor reinforcement, by improving installation work of the anchor reinforcement to a precast pile, without reducing joining force between the precast pile and foundation concrete.SOLUTION: In an anchor reinforcement connection metal fitting 1, six sleeves 3 are respectively fixed to a predetermined position of an outer peripheral surface of a pair of curved plates 21 in a state of separating in parallel to the axis of a cylindrical ring body 2 via a pair of sandwiching plates 27. The pair of sandwiching plates 27 are welded in a state of expanding toward the curved plate 21 side so as to become a V shape in a plan view. The cylindrical ring body 2 is inserted into an upper end part of a precast pile 10, and after fastening those by a bolt 25 and a nut 26, an anchor reinforcement 30 is fixed to the sleeves 3.SELECTED DRAWING: Figure 1
【課題】既製杭と基礎コンクリートとの間の結合力を低下させることなく、既製杭に対するアンカー鉄筋の取付作業を向上させることができ、アンカー鉄筋の引張力低減によりコストダウンが可能なアンカー鉄筋接続金具を提供する。【解決手段】アンカー鉄筋接続金具1は、一対の湾曲プレート21の外周面の所定位置に6個のスリーブ3がそれぞれ一対の挟持プレート27を介して円筒状リング体2の軸心と平行に離れた状態で固着される。一対の挟持プレート27は、平面視V字状となるように湾曲プレート21側に向けて広がった状態で溶接される。既製杭10の上端部に円筒状リング体2を挿入し、それらをボルト25とナット26で締め付けた後、アンカー鉄筋30をスリーブ3に固定する。【選択図】図1
ANCHOR REINFORCEMENT CONNECTION METAL FITTING
アンカー鉄筋接続金具
KADOYA HARUKATSU (Autor:in)
28.09.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|REINFORCEMENT MATERIAL CONNECTION METAL FITTING OF SUSPENSION CEILING STRUCTURE
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2021
|