Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
DIKE AND CONSTRUCTION METHOD OF DIKE
PROBLEM TO BE SOLVED: To provide a dike and a construction method thereof capable of level-rasing/strengthening the dike, without requiring a large amount of cost, in the present invention.SOLUTION: The present invention is provided as a construction of a dike for constructing a dike strengthening structure having a building height higher than the top end of the dike integrally with a cutting part by forming the cutting part by cutting a part of the reverse slope face side of an existing dike. The present invention is also provided as the dike having a surface slope face side part of the existing dike and the dike strengthening structure arranged on the reverse slope face side of the existing dike, having the building height higher than the top end of the dike and integrally formed with the surface slope face side part.SELECTED DRAWING: Figure 3
【課題】 本発明は、多額の費用を掛けることなく、堤防を嵩上げ/強化することができる堤防及びその構築方法を提供する。【解決手段】 本発明は、既存の堤防の裏法面側の一部を切削することで切削部を形成し、前記堤防の天端よりも高い建物高さを有する堤防強化構築物を前記切削部と一体に建設することを特徴とする堤防の構築方法とした。また、本発明は、既存の堤防の表法面側の部分と、前記既存の堤防の裏法面側に配置され、前記堤防の天端よりも高い建物高さを有し、前記表法面側の部分と一体に形成された防強化構築物とを有することを特徴とする堤防とした。【選択図】 図3
DIKE AND CONSTRUCTION METHOD OF DIKE
PROBLEM TO BE SOLVED: To provide a dike and a construction method thereof capable of level-rasing/strengthening the dike, without requiring a large amount of cost, in the present invention.SOLUTION: The present invention is provided as a construction of a dike for constructing a dike strengthening structure having a building height higher than the top end of the dike integrally with a cutting part by forming the cutting part by cutting a part of the reverse slope face side of an existing dike. The present invention is also provided as the dike having a surface slope face side part of the existing dike and the dike strengthening structure arranged on the reverse slope face side of the existing dike, having the building height higher than the top end of the dike and integrally formed with the surface slope face side part.SELECTED DRAWING: Figure 3
【課題】 本発明は、多額の費用を掛けることなく、堤防を嵩上げ/強化することができる堤防及びその構築方法を提供する。【解決手段】 本発明は、既存の堤防の裏法面側の一部を切削することで切削部を形成し、前記堤防の天端よりも高い建物高さを有する堤防強化構築物を前記切削部と一体に建設することを特徴とする堤防の構築方法とした。また、本発明は、既存の堤防の表法面側の部分と、前記既存の堤防の裏法面側に配置され、前記堤防の天端よりも高い建物高さを有し、前記表法面側の部分と一体に形成された防強化構築物とを有することを特徴とする堤防とした。【選択図】 図3
DIKE AND CONSTRUCTION METHOD OF DIKE
堤防及び堤防の構築方法
HAYASHI SHINICHIRO (Autor:in) / HAYASHI WASHIO (Autor:in) / HAYASHI KOZABURO (Autor:in) / HAYASHI KANAKO (Autor:in)
05.10.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Support pile, dike dam and construction method of dike dam
Europäisches Patentamt | 2024
|Component for deformation joint of fire dike, fire dike and construction method of fire dike
Europäisches Patentamt | 2021
|