CONSTRUCTION METHOD OF DIKE AND DIKE
To achieve improvement in construction efficiency and construction accuracy, and to suppress deterioration in quality.SOLUTION: In a construction method of dike, a liner unit 20 is unitized by integrally assembling a circular arc outer tank liner plate 2 located on an inner peripheral surface of a lot and for constituting an outer tank, and inside reinforcements 41 located on an outer peripheral side of the outer tank liner plate 2 and embedded in a concrete of the lot in a posture of being placed horizontally. On an outside surface of the outer tank liner plate 2, a vertical reinforcement materials 21 are provided which extend vertically in a posture of being placed vertically and in which multiple through-holes 213 are formed vertically with an interval. In each of the multiple through-holes 213 of the vertical reinforcement material 21, an inner horizontal reinforcement 41A of the inside reinforcement 41 is inserted. An inner vertical reinforcement 41B is mounted on the inner horizontal reinforcement 41A. A reinforcement support material 22A extending radially is provided in a vertical reinforcement material 42, and an outer horizontal reinforcement 42A and an outer vertical reinforcement 42B of the outside reinforcement 42 are placed so as to be close to the reinforcement support material 22A.SELECTED DRAWING: Figure 3
【課題】施工効率及び施工精度の向上を図ることができるうえ、品質の低下を抑制できる。【解決手段】ロットの内周面に位置して外槽を構成する円弧状の外槽ライナープレート2と、外槽ライナープレート2の外周側に配置されロットのコンクリート中に埋設される内側鉄筋41とを、横置き姿勢とした状態で一体に組み付けてライナーユニット20をユニット化し、外槽ライナープレート2の外側面に、縦置き姿勢の状態で上下方向に延びるとともに上下方向に間隔をあけて複数の貫通穴213が形成された縦補強材21を設け、縦補強材21の複数の貫通穴213のそれぞれに内側鉄筋41の内横筋41Aを挿通させ、内横筋41Aに内縦筋41Bを取り付け、縦補強材42に径方向に延びる鉄筋支持材22Aを設け、鉄筋支持材22Aに対して外側鉄筋42の外横筋42A及び外縦筋42Bを添わせるように支持する防液堤の施工方法を提供する。【選択図】図3
CONSTRUCTION METHOD OF DIKE AND DIKE
To achieve improvement in construction efficiency and construction accuracy, and to suppress deterioration in quality.SOLUTION: In a construction method of dike, a liner unit 20 is unitized by integrally assembling a circular arc outer tank liner plate 2 located on an inner peripheral surface of a lot and for constituting an outer tank, and inside reinforcements 41 located on an outer peripheral side of the outer tank liner plate 2 and embedded in a concrete of the lot in a posture of being placed horizontally. On an outside surface of the outer tank liner plate 2, a vertical reinforcement materials 21 are provided which extend vertically in a posture of being placed vertically and in which multiple through-holes 213 are formed vertically with an interval. In each of the multiple through-holes 213 of the vertical reinforcement material 21, an inner horizontal reinforcement 41A of the inside reinforcement 41 is inserted. An inner vertical reinforcement 41B is mounted on the inner horizontal reinforcement 41A. A reinforcement support material 22A extending radially is provided in a vertical reinforcement material 42, and an outer horizontal reinforcement 42A and an outer vertical reinforcement 42B of the outside reinforcement 42 are placed so as to be close to the reinforcement support material 22A.SELECTED DRAWING: Figure 3
【課題】施工効率及び施工精度の向上を図ることができるうえ、品質の低下を抑制できる。【解決手段】ロットの内周面に位置して外槽を構成する円弧状の外槽ライナープレート2と、外槽ライナープレート2の外周側に配置されロットのコンクリート中に埋設される内側鉄筋41とを、横置き姿勢とした状態で一体に組み付けてライナーユニット20をユニット化し、外槽ライナープレート2の外側面に、縦置き姿勢の状態で上下方向に延びるとともに上下方向に間隔をあけて複数の貫通穴213が形成された縦補強材21を設け、縦補強材21の複数の貫通穴213のそれぞれに内側鉄筋41の内横筋41Aを挿通させ、内横筋41Aに内縦筋41Bを取り付け、縦補強材42に径方向に延びる鉄筋支持材22Aを設け、鉄筋支持材22Aに対して外側鉄筋42の外横筋42A及び外縦筋42Bを添わせるように支持する防液堤の施工方法を提供する。【選択図】図3
CONSTRUCTION METHOD OF DIKE AND DIKE
防液堤の施工方法、及び防液堤
ABE TAKASHI (Autor:in) / YOSHIDA DAIKI (Autor:in) / WAKABAYASHI MASAKI (Autor:in) / ITO AKIRA (Autor:in) / YAMADA JUICHIRO (Autor:in)
12.09.2019
Patent
Elektronische Ressource
Japanisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Component for deformation joint of fire dike, fire dike and construction method of fire dike
Europäisches Patentamt | 2021
|Support pile, dike dam and construction method of dike dam