ERECTION METHOD OF SIMPLE TEMPORARY BRIDGE
PROBLEM TO BE SOLVED: To provide an erection method of a simple temporary bridge capable of largely reducing construction cost by using general-purpose materials, and capable of simplifying the materials for constituting a superstructure of the simple temporary bridge.SOLUTION: A process of extending a manual-extending temporary girder 30 toward the bridge axial direction by connecting to an existing superstructure, a process of removing a side girth 32 while leaving a girder bearer 31 erected between head parts of a plurality of erected support piles 20 as it is and a process of assembling the superstructure by mounting a plurality of main girders 40 between the girder bearers 31 separated at an interval, are repeatedly executed by a span unit by using the manual-extending temporary girder 30 presenting a plane U shape having the girder bearer 31 with a pile guide cylinder 33 and a pair of detachably connected side girths 32.SELECTED DRAWING: Figure 1
【課題】汎用資材を使用できて工費の大幅削減が可能であるとともに、簡易仮橋の上部工を構成する資材を簡略化できる簡易仮橋の架設方法を提供すること。【解決手段】杭ガイド筒33を具備した桁受材31と、着脱可能に連結した一対の側方つなぎ材32とを具備した平面コ字形を呈する手延仮桁30を使用し、既設上部工に連結して手延仮桁30を橋軸方向へ向けて延設する工程と、立設した複数の支持杭20の頭部間に架設した桁受材31を残置しつつ、側方つなぎ材32を撤去する工程と、間隔を隔てた桁受材31の間に複数の主桁40を搭載して上部工を組み立てる工程とをスパン単位で繰り返して行う。【選択図】図1
ERECTION METHOD OF SIMPLE TEMPORARY BRIDGE
PROBLEM TO BE SOLVED: To provide an erection method of a simple temporary bridge capable of largely reducing construction cost by using general-purpose materials, and capable of simplifying the materials for constituting a superstructure of the simple temporary bridge.SOLUTION: A process of extending a manual-extending temporary girder 30 toward the bridge axial direction by connecting to an existing superstructure, a process of removing a side girth 32 while leaving a girder bearer 31 erected between head parts of a plurality of erected support piles 20 as it is and a process of assembling the superstructure by mounting a plurality of main girders 40 between the girder bearers 31 separated at an interval, are repeatedly executed by a span unit by using the manual-extending temporary girder 30 presenting a plane U shape having the girder bearer 31 with a pile guide cylinder 33 and a pair of detachably connected side girths 32.SELECTED DRAWING: Figure 1
【課題】汎用資材を使用できて工費の大幅削減が可能であるとともに、簡易仮橋の上部工を構成する資材を簡略化できる簡易仮橋の架設方法を提供すること。【解決手段】杭ガイド筒33を具備した桁受材31と、着脱可能に連結した一対の側方つなぎ材32とを具備した平面コ字形を呈する手延仮桁30を使用し、既設上部工に連結して手延仮桁30を橋軸方向へ向けて延設する工程と、立設した複数の支持杭20の頭部間に架設した桁受材31を残置しつつ、側方つなぎ材32を撤去する工程と、間隔を隔てた桁受材31の間に複数の主桁40を搭載して上部工を組み立てる工程とをスパン単位で繰り返して行う。【選択図】図1
ERECTION METHOD OF SIMPLE TEMPORARY BRIDGE
簡易仮橋の架設方法
TANAKA MASAHITO (Autor:in) / ISHIGURO MAKOTO (Autor:in)
19.10.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
Temporary pier applicable to bridge erection in water and construction method
Europäisches Patentamt | 2016
|Unusual resourcefulness marks erection of temporary bridge after Vermont flood
Engineering Index Backfile | 1928
Simple expedient solves problem in bridge erection
Engineering Index Backfile | 1928
|BRIDGE ERECTION METHOD AND LAUNCHING MACHINE FOR BRIDGE ERECTION
Europäisches Patentamt | 2022
|Reliability during temporary erection conditions
British Library Conference Proceedings | 1996
|