PROBLEM TO BE SOLVED: To provide an installation structure of a building unit that facilitates level adjustment of the building unit.SOLUTION: A building unit 20 includes a plurality of support members 13 for supporting each column 21 of the building unit 20 from below, and is installed on an earthen floor 11 through the support members 13. The support member 13 includes a first fixing part 35 fixed on the earthen floor 11 with an anchor bolt 41, a second fixing part 36 having a bottom end of the column 21 fixed thereon, and a connecting shaft part 37 connecting the fixing parts 35, 36 vertically. The connecting shaft part 37 includes a pair of male screw parts 56, 57 screwed respectively on the fixing parts 35, 36, and is connected rotatably to the fixing parts 35, 36 through the male screw parts 56, 57. In this case, a height position of the second fixing part 36 may be adjusted with regard to the first fixing part 35, by rotating the connecting shaft part 37 with regard to the fixing parts 35, 36 and relatively displacing the fixing parts 35, 36 in a vertical direction.SELECTED DRAWING: Figure 4
【課題】建物ユニットのレベル調整を比較的容易に行うことができる建物ユニットの設置構造を提供する。【解決手段】建物ユニット20の各柱21を下方から支持する複数の支持部材13を備え、建物ユニット20は各支持部材13を介して土間床11の上に設置されている。支持部材13は、土間床11上にアンカーボルト41により固定された第1固定部35と、柱21の下端部が固定された第2固定部36と、各固定部35,36を上下に連結する連結軸部37とを備える。連結軸部37は、各固定部35,36に螺合される一対のおねじ部56,57を有し、それらおねじ部56,57を介して各固定部35,36に回転可能に連結されている。この場合、連結軸部37を各固定部35、36に対して回転操作することにより、それら両者35,36を上下方向に相対変位させることで、第1固定部35に対する第2固定部36の高さ位置を調整可能となっている。【選択図】 図4
INSTALLATION STRUCTURE OF BUILDING UNIT
PROBLEM TO BE SOLVED: To provide an installation structure of a building unit that facilitates level adjustment of the building unit.SOLUTION: A building unit 20 includes a plurality of support members 13 for supporting each column 21 of the building unit 20 from below, and is installed on an earthen floor 11 through the support members 13. The support member 13 includes a first fixing part 35 fixed on the earthen floor 11 with an anchor bolt 41, a second fixing part 36 having a bottom end of the column 21 fixed thereon, and a connecting shaft part 37 connecting the fixing parts 35, 36 vertically. The connecting shaft part 37 includes a pair of male screw parts 56, 57 screwed respectively on the fixing parts 35, 36, and is connected rotatably to the fixing parts 35, 36 through the male screw parts 56, 57. In this case, a height position of the second fixing part 36 may be adjusted with regard to the first fixing part 35, by rotating the connecting shaft part 37 with regard to the fixing parts 35, 36 and relatively displacing the fixing parts 35, 36 in a vertical direction.SELECTED DRAWING: Figure 4
【課題】建物ユニットのレベル調整を比較的容易に行うことができる建物ユニットの設置構造を提供する。【解決手段】建物ユニット20の各柱21を下方から支持する複数の支持部材13を備え、建物ユニット20は各支持部材13を介して土間床11の上に設置されている。支持部材13は、土間床11上にアンカーボルト41により固定された第1固定部35と、柱21の下端部が固定された第2固定部36と、各固定部35,36を上下に連結する連結軸部37とを備える。連結軸部37は、各固定部35,36に螺合される一対のおねじ部56,57を有し、それらおねじ部56,57を介して各固定部35,36に回転可能に連結されている。この場合、連結軸部37を各固定部35、36に対して回転操作することにより、それら両者35,36を上下方向に相対変位させることで、第1固定部35に対する第2固定部36の高さ位置を調整可能となっている。【選択図】 図4
INSTALLATION STRUCTURE OF BUILDING UNIT
建物ユニットの設置構造
YAMADA SHINTARO (Autor:in)
26.10.2017
Patent
Elektronische Ressource
Japanisch
Europäisches Patentamt | 2015
|INSTALLATION STRUCTURE OF STORAGE SECTION AND BUILDING UNIT
Europäisches Patentamt | 2020
|