CONSTRUCTION METHOD OF BASE STRUCTURE, AND BASE STRUCTURE
PROBLEM TO BE SOLVED: To provide a rational construction method of a base structure and the base structure that enable a bottom slab constructed by a cement press-in construction method to be used as a base structure body when the base structure is constructed by applying the cement press-in construction method to a temporary earth retaining work, at the same time curtailing the construction period and reducing a construction cost.SOLUTION: A construction method of a base structure includes the following steps for: constructing a vertical pit 10 in a ground as a temporary earth retaining structure by repeating steps for pressing-in a ring-form segment 12 into a ground G, excavating the ground G inside the segment 12 that has been pressed in and discharging the soil, and then adding the ring-form segment 12 on top of the existing segment 12; installing a reinforcement cage 14 assembled on the ground by lowering to a bottom part 16 of the vertical pit 10 that has been constructed; and casting concrete 28 such that to bury the reinforcement cage 14 that has been installed on the bottom part 16 of the vertical pit 10.SELECTED DRAWING: Figure 1
【課題】セグメント圧入工法を仮設土留工事に適用して基礎構造物を構築する場合において、セグメント圧入工法で施工される底版を基礎構造物本体として利用することが可能で、工程を短縮し工費を低減することのできる合理的な基礎構造物の施工方法および基礎構造物を提供する。【解決手段】リング状のセグメント12を地盤Gに圧入した後、圧入したセグメント12の内部の地盤Gを掘削して排土し、その後、既設のセグメント12の上にリング状のセグメント12を増設する工程を繰り返すことで地中に仮設土留としての立坑10を構築する工程と、構築した立坑10の底部16に地上で地組した鉄筋籠14を沈設する工程と、立坑10の底部16に沈設した鉄筋籠14を埋設する態様でコンクリート28を打設する工程とを備えるようにする。【選択図】図1
CONSTRUCTION METHOD OF BASE STRUCTURE, AND BASE STRUCTURE
PROBLEM TO BE SOLVED: To provide a rational construction method of a base structure and the base structure that enable a bottom slab constructed by a cement press-in construction method to be used as a base structure body when the base structure is constructed by applying the cement press-in construction method to a temporary earth retaining work, at the same time curtailing the construction period and reducing a construction cost.SOLUTION: A construction method of a base structure includes the following steps for: constructing a vertical pit 10 in a ground as a temporary earth retaining structure by repeating steps for pressing-in a ring-form segment 12 into a ground G, excavating the ground G inside the segment 12 that has been pressed in and discharging the soil, and then adding the ring-form segment 12 on top of the existing segment 12; installing a reinforcement cage 14 assembled on the ground by lowering to a bottom part 16 of the vertical pit 10 that has been constructed; and casting concrete 28 such that to bury the reinforcement cage 14 that has been installed on the bottom part 16 of the vertical pit 10.SELECTED DRAWING: Figure 1
【課題】セグメント圧入工法を仮設土留工事に適用して基礎構造物を構築する場合において、セグメント圧入工法で施工される底版を基礎構造物本体として利用することが可能で、工程を短縮し工費を低減することのできる合理的な基礎構造物の施工方法および基礎構造物を提供する。【解決手段】リング状のセグメント12を地盤Gに圧入した後、圧入したセグメント12の内部の地盤Gを掘削して排土し、その後、既設のセグメント12の上にリング状のセグメント12を増設する工程を繰り返すことで地中に仮設土留としての立坑10を構築する工程と、構築した立坑10の底部16に地上で地組した鉄筋籠14を沈設する工程と、立坑10の底部16に沈設した鉄筋籠14を埋設する態様でコンクリート28を打設する工程とを備えるようにする。【選択図】図1
CONSTRUCTION METHOD OF BASE STRUCTURE, AND BASE STRUCTURE
基礎構造物の施工方法および基礎構造物
ONODA HAJIME (Autor:in) / ENDO KAZUO (Autor:in) / OTAKA MASAHIRO (Autor:in) / YAMANAKA TOSHIAKI (Autor:in) / YAMAMOTO TOSHIFUMI (Autor:in) / IUCHI TAKAYA (Autor:in) / HAMADA YOSHIYUKI (Autor:in) / MURAKAMI MITSUGI (Autor:in) / ARAKAWA TOSHIHIRO (Autor:in)
07.12.2017
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION METHOD OF BASE STRUCTURE AND BASE STRUCTURE
Europäisches Patentamt | 2022
|BASE STRUCTURE, STEEL SEGMENT USED FOR BASE STRUCTURE, AND CONSTRUCTION METHOD OF BASE STRUCTURE
Europäisches Patentamt | 2021
|CEILING BASE STRUCTURE AND CONSTRUCTION METHOD OF CEILING BASE STRUCTURE
Europäisches Patentamt | 2017
|BASE FLOOR STRUCTURE AND CONSTRUCTION METHOD OF BASE FLOOR
Europäisches Patentamt | 2020
|IMPROVED BASE STRUCTURE, AND CONSTRUCTION METHOD OF IMPROVED BASE
Europäisches Patentamt | 2020
|