REPAIR METHOD OF DIRT-FLOOR CONCRETE OF EXISTING STRUCTURE
PROBLEM TO BE SOLVED: To connect a part between dirt-floor concrete and a dispersion beam in high strength by simple work.SOLUTION: A connection bolt 21 for connecting a part between deformed dirt-floor concrete 10 and a dispersion beam 20 and an open leg anchor 60 having a plurality of anchor legs 61 and a convergence nut 62 are used, and after opening a connection hole 17 opened in the dirt-floor concrete 10, a diameter expanded space 43 is formed under the dirt-floor concrete 10, and a diameter expanded pressure receiving board 52 is formed by filing a consolidation material in the diameter expanded space 43 for installing the open leg anchor 60, and a part between the dirt-floor concrete 10 and a lower part of the connection bolt 21 is connected in high strength via the diameter expanded pressure receiving board 52.SELECTED DRAWING: Figure 8
【課題】簡単な作業で以って土間コンクリ−トと分散梁間を高強度に連結すること。【解決手段】変形した土間コンクリート10と分散梁20の間を連結する連結ボルト21と、複数のアンカー脚61と収束ナット62を具備した開脚アンカー60とを使用し、土間コンクリ−ト10に開設した連結孔17を開設した後に、土間コンクリート10の下方に拡径空間43を形成し、開脚アンカー60を設置した拡径空間43内に固結材を充填して拡径受圧版52を形成し、拡径受圧版52を介して土間コンクリート10と連結ボルト21の下部との間を高強度に連結する。【選択図】図8
REPAIR METHOD OF DIRT-FLOOR CONCRETE OF EXISTING STRUCTURE
PROBLEM TO BE SOLVED: To connect a part between dirt-floor concrete and a dispersion beam in high strength by simple work.SOLUTION: A connection bolt 21 for connecting a part between deformed dirt-floor concrete 10 and a dispersion beam 20 and an open leg anchor 60 having a plurality of anchor legs 61 and a convergence nut 62 are used, and after opening a connection hole 17 opened in the dirt-floor concrete 10, a diameter expanded space 43 is formed under the dirt-floor concrete 10, and a diameter expanded pressure receiving board 52 is formed by filing a consolidation material in the diameter expanded space 43 for installing the open leg anchor 60, and a part between the dirt-floor concrete 10 and a lower part of the connection bolt 21 is connected in high strength via the diameter expanded pressure receiving board 52.SELECTED DRAWING: Figure 8
【課題】簡単な作業で以って土間コンクリ−トと分散梁間を高強度に連結すること。【解決手段】変形した土間コンクリート10と分散梁20の間を連結する連結ボルト21と、複数のアンカー脚61と収束ナット62を具備した開脚アンカー60とを使用し、土間コンクリ−ト10に開設した連結孔17を開設した後に、土間コンクリート10の下方に拡径空間43を形成し、開脚アンカー60を設置した拡径空間43内に固結材を充填して拡径受圧版52を形成し、拡径受圧版52を介して土間コンクリート10と連結ボルト21の下部との間を高強度に連結する。【選択図】図8
REPAIR METHOD OF DIRT-FLOOR CONCRETE OF EXISTING STRUCTURE
既設構造物の土間コンクリートの補修方法
HIRATA MASAHIRO (Autor:in) / NISHINA KEN (Autor:in) / ITO NAOKI (Autor:in)
11.01.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
METHOD OF REMOVING DIRT FLOOR CONCRETE AND METHOD OF SETTING UP POLE