Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD OF REMOVING DIRT FLOOR CONCRETE AND METHOD OF SETTING UP POLE
To provide a dirt floor concrete removing method capable of efficiently removing a part of dirt floor concrete in a short time.SOLUTION: The dirt floor concrete removing method is a soil concrete removing method for removing a part of an existing dirt floor concrete 16, including a cutting step S1 in which at least a part of each side of a polygon is cut on the surface of the dirt plate concrete 16 by a concrete cutter 30 to form a block 34 having a shape whose surface is surrounded by a polygon, a hanging tool step S3 for installing an eye nut 42 on the block 34, and a lifting step S4 in which the block 34 is lifted by the lifting device 44 via the eye nut 42. When the dirt floor concrete 16 is provided with a reinforcement 18, the dirt floor concrete 16 is cut together with the reinforcement 18 in the cutting step S1.SELECTED DRAWING: Figure 3
【課題】短時間で効率的に土間コンクリートの一部を除去することのできる土間コンクリート除去方法を提供する。【解決手段】土間コンクリート除去方法は、既存の土間コンクリート16の一部を除去する土間コンクリート除去方法であって、コンクリートカッター30により土間コンクリート16における表面上で多角形の各辺の少なくとも一部を切削し、表面が多角形で囲われた形状のブロック34を形成する切削工程S1と、ブロック34にアイナット42を設置する吊り具工程S3と、アイナット42を介して吊り上げ装置44によってブロック34を吊り上げる吊り上げ工程S4とを有する。土間コンクリート16に配筋18が設けられている場合には、切削工程S1において、配筋18とともに土間コンクリート16を切削する。【選択図】図3
METHOD OF REMOVING DIRT FLOOR CONCRETE AND METHOD OF SETTING UP POLE
To provide a dirt floor concrete removing method capable of efficiently removing a part of dirt floor concrete in a short time.SOLUTION: The dirt floor concrete removing method is a soil concrete removing method for removing a part of an existing dirt floor concrete 16, including a cutting step S1 in which at least a part of each side of a polygon is cut on the surface of the dirt plate concrete 16 by a concrete cutter 30 to form a block 34 having a shape whose surface is surrounded by a polygon, a hanging tool step S3 for installing an eye nut 42 on the block 34, and a lifting step S4 in which the block 34 is lifted by the lifting device 44 via the eye nut 42. When the dirt floor concrete 16 is provided with a reinforcement 18, the dirt floor concrete 16 is cut together with the reinforcement 18 in the cutting step S1.SELECTED DRAWING: Figure 3
【課題】短時間で効率的に土間コンクリートの一部を除去することのできる土間コンクリート除去方法を提供する。【解決手段】土間コンクリート除去方法は、既存の土間コンクリート16の一部を除去する土間コンクリート除去方法であって、コンクリートカッター30により土間コンクリート16における表面上で多角形の各辺の少なくとも一部を切削し、表面が多角形で囲われた形状のブロック34を形成する切削工程S1と、ブロック34にアイナット42を設置する吊り具工程S3と、アイナット42を介して吊り上げ装置44によってブロック34を吊り上げる吊り上げ工程S4とを有する。土間コンクリート16に配筋18が設けられている場合には、切削工程S1において、配筋18とともに土間コンクリート16を切削する。【選択図】図3
METHOD OF REMOVING DIRT FLOOR CONCRETE AND METHOD OF SETTING UP POLE
土間コンクリート除去方法およびポール立設方法
YAMAMOTO TOSHIAKI (Autor:in) / KITANO MASAMI (Autor:in) / AIBA MASAHIKO (Autor:in) / JODO KAZUKI (Autor:in)
27.09.2021
Patent
Elektronische Ressource
Japanisch
REPAIR METHOD OF DIRT-FLOOR CONCRETE OF EXISTING STRUCTURE
Europäisches Patentamt | 2018
|