Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PROBLEM TO BE SOLVED: To provide a construction method of a weir and the weir that use fluidized soil cement utilizing local sediment at the construction site and capable of constructing the weir measuring over 30 cm in height using the highly fluid fluidized cement at a time of filling, and eliminating excess water after filling.SOLUTION: A weir 1 prevents topographic deformation such as a debris flow and a landslide utilizing heavy weight, and includes a steel frame 2 that assembles a steel strip material (a steel material 20), a plurality of swelling prevention materials 3 fitted on the steel frame 2, and soil cement 4 having local sediment at the construction site hardened by cement milk. The soil cement 4 filled in a cloth mold is loaded in a space A formed between the plurality of swelling prevention materials 3, and a groove or a cavity h2 is formed on the steel strip material (the steel material 20) for draining excess water seeping out from the cloth mold.SELECTED DRAWING: Figure 1
【課題】施工現場の現地土砂を利用し、充填時に流動性の高い流動化ソイルセメントを用いて高さ30cmを超える堰堤を構築することができ、充填後に余剰水を排除することができる流動化ソイルセメントを用いた堰堤の構築方法及び堰堤を提供する。【解決手段】重量により土石流や地滑りなどの地形変形を防止する堰堤1において、鋼製条材(鋼材20)が組み合わされた鋼製フレーム2と、この鋼製フレーム2に取り付けられた複数のはらみ防止材3と、施工現場の現地土砂がセメントミルクで硬化されたソイルセメント4と、を備え、布製型枠に充填されたソイルセメント4を、複数のはらみ防止材3の間に形成された空間A内に装填し、鋼製条材(鋼材20)に、布製型枠から染み出した余剰水を排水する溝又は空洞h2を形成する。【選択図】図1
PROBLEM TO BE SOLVED: To provide a construction method of a weir and the weir that use fluidized soil cement utilizing local sediment at the construction site and capable of constructing the weir measuring over 30 cm in height using the highly fluid fluidized cement at a time of filling, and eliminating excess water after filling.SOLUTION: A weir 1 prevents topographic deformation such as a debris flow and a landslide utilizing heavy weight, and includes a steel frame 2 that assembles a steel strip material (a steel material 20), a plurality of swelling prevention materials 3 fitted on the steel frame 2, and soil cement 4 having local sediment at the construction site hardened by cement milk. The soil cement 4 filled in a cloth mold is loaded in a space A formed between the plurality of swelling prevention materials 3, and a groove or a cavity h2 is formed on the steel strip material (the steel material 20) for draining excess water seeping out from the cloth mold.SELECTED DRAWING: Figure 1
【課題】施工現場の現地土砂を利用し、充填時に流動性の高い流動化ソイルセメントを用いて高さ30cmを超える堰堤を構築することができ、充填後に余剰水を排除することができる流動化ソイルセメントを用いた堰堤の構築方法及び堰堤を提供する。【解決手段】重量により土石流や地滑りなどの地形変形を防止する堰堤1において、鋼製条材(鋼材20)が組み合わされた鋼製フレーム2と、この鋼製フレーム2に取り付けられた複数のはらみ防止材3と、施工現場の現地土砂がセメントミルクで硬化されたソイルセメント4と、を備え、布製型枠に充填されたソイルセメント4を、複数のはらみ防止材3の間に形成された空間A内に装填し、鋼製条材(鋼材20)に、布製型枠から染み出した余剰水を排水する溝又は空洞h2を形成する。【選択図】図1
WEIR AND CONSTRUCTION METHOD THEREFOR
堰堤及び堰堤の構築方法
SHIMA JOJI (Autor:in)
08.02.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Europäisches Patentamt | 2021
|Construction of the chanoine weir
Engineering Index Backfile | 1925
|