METHOD FOR CONSTRUCTING PARTITION REVETMENT
PROBLEM TO BE SOLVED: To provide a method for constructing a partition revetment capable of performing seepage control work for joint portions easily and firmly while mitigating an influence of a tidal range in construction of a sea level waste disposal site etc.SOLUTION: This construction method of a partition revetment is a method for constructing a partition revetment 2 so as to surround a water area in a predetermined range. The partition revetment is constructed in the shape of an embankment while leaving an opening 4 and a water passing part 5 in which a cross-sectional area for water passing is smaller than the opening remain, and structures for shutting the opening are installed on the opening. Seepage control work is performed for joint portions formed by installation of the structures, and the water passing part is then shut.SELECTED DRAWING: Figure 1
【課題】廃棄物海面処分場等の構築に際し、干満差の影響を緩和して目地部の遮水処理を容易かつ確実に実施できる仕切護岸の構築方法を提供する。【解決手段】この仕切護岸の構築方法は、水域を所定の範囲で包囲するようにして仕切護岸2を構築する方法であって、開口部4と開口部よりも通水断面積が小さい通水部5とを残して仕切護岸を堤防状に構築し、開口部を締め切るための構造物を開口部に据え付け、構造物の据え付けにより形成される目地部について遮水処理を行い、次に、通水部を締め切る。【選択図】図1
METHOD FOR CONSTRUCTING PARTITION REVETMENT
PROBLEM TO BE SOLVED: To provide a method for constructing a partition revetment capable of performing seepage control work for joint portions easily and firmly while mitigating an influence of a tidal range in construction of a sea level waste disposal site etc.SOLUTION: This construction method of a partition revetment is a method for constructing a partition revetment 2 so as to surround a water area in a predetermined range. The partition revetment is constructed in the shape of an embankment while leaving an opening 4 and a water passing part 5 in which a cross-sectional area for water passing is smaller than the opening remain, and structures for shutting the opening are installed on the opening. Seepage control work is performed for joint portions formed by installation of the structures, and the water passing part is then shut.SELECTED DRAWING: Figure 1
【課題】廃棄物海面処分場等の構築に際し、干満差の影響を緩和して目地部の遮水処理を容易かつ確実に実施できる仕切護岸の構築方法を提供する。【解決手段】この仕切護岸の構築方法は、水域を所定の範囲で包囲するようにして仕切護岸2を構築する方法であって、開口部4と開口部よりも通水断面積が小さい通水部5とを残して仕切護岸を堤防状に構築し、開口部を締め切るための構造物を開口部に据え付け、構造物の据え付けにより形成される目地部について遮水処理を行い、次に、通水部を締め切る。【選択図】図1
METHOD FOR CONSTRUCTING PARTITION REVETMENT
仕切護岸の構築方法
SASAKI MAKOTO (Autor:in) / NAKANO MASAYUKI (Autor:in) / SEKI YUJI (Autor:in)
10.05.2018
Patent
Elektronische Ressource
Japanisch