ARTIFICIAL GROUND AND METHOD FOR CONSTRUCTING THE SAME
PROBLEM TO BE SOLVED: To construct artificial ground with high stability with the effect of suppressing sinking by utilizing repulsion energy and buoyancy of a foamed resin block.SOLUTION: The artificial ground includes a foamed resin block 1, a pile 4, a field-in-place concrete 7, and a reinforcing bar 10. The foamed resin block has an inverted pyramidal recess 2 on the upper surface of the block and a pile insertion hole 3 at the bottom of the inverted pyramidal recess 2 and is laid on the ground 15. The piles are driven into the local ground 15 through the pile insertion holes 3, leaving the upper part in the inverted pyramidal recess 2. The field-in-place concrete 7 has an inverted pyramidal portion 8 which is placed in the inverted pyramidal recess 2 and joined to the upper portion of the pile 4 and has a plate-like portion 9 placed on the foamed resin block 1 and integrated with the inverted pyramidal portion 8. The reinforcing bars 10 are buried in the plate-like portion 9.SELECTED DRAWING: Figure 5
【課題】発泡樹脂ブロックによる反発のエネルギーや浮力も利用し、沈下抑制効果及び安定性の高い人工地盤を構築する。【解決手段】人工地盤は、ブロック上面に逆錘形凹部2を有し逆錘形凹部2の底に杭挿通孔3を有する、現地地盤15に敷設された発泡樹脂ブロック1と、杭挿通孔3を通して現地地盤15に打ち込まれ、上部を逆錘形凹部2に残した杭4と、逆錘形凹部2に打設されて杭4の上部と接合した逆錐状部8と発泡樹脂ブロック1の上に打設されて逆錐状部8と一体化した版状部9とからなる現場打ちコンクリート7と、版状部9に埋設された補強鉄筋10とを含む。【選択図】図5
ARTIFICIAL GROUND AND METHOD FOR CONSTRUCTING THE SAME
PROBLEM TO BE SOLVED: To construct artificial ground with high stability with the effect of suppressing sinking by utilizing repulsion energy and buoyancy of a foamed resin block.SOLUTION: The artificial ground includes a foamed resin block 1, a pile 4, a field-in-place concrete 7, and a reinforcing bar 10. The foamed resin block has an inverted pyramidal recess 2 on the upper surface of the block and a pile insertion hole 3 at the bottom of the inverted pyramidal recess 2 and is laid on the ground 15. The piles are driven into the local ground 15 through the pile insertion holes 3, leaving the upper part in the inverted pyramidal recess 2. The field-in-place concrete 7 has an inverted pyramidal portion 8 which is placed in the inverted pyramidal recess 2 and joined to the upper portion of the pile 4 and has a plate-like portion 9 placed on the foamed resin block 1 and integrated with the inverted pyramidal portion 8. The reinforcing bars 10 are buried in the plate-like portion 9.SELECTED DRAWING: Figure 5
【課題】発泡樹脂ブロックによる反発のエネルギーや浮力も利用し、沈下抑制効果及び安定性の高い人工地盤を構築する。【解決手段】人工地盤は、ブロック上面に逆錘形凹部2を有し逆錘形凹部2の底に杭挿通孔3を有する、現地地盤15に敷設された発泡樹脂ブロック1と、杭挿通孔3を通して現地地盤15に打ち込まれ、上部を逆錘形凹部2に残した杭4と、逆錘形凹部2に打設されて杭4の上部と接合した逆錐状部8と発泡樹脂ブロック1の上に打設されて逆錐状部8と一体化した版状部9とからなる現場打ちコンクリート7と、版状部9に埋設された補強鉄筋10とを含む。【選択図】図5
ARTIFICIAL GROUND AND METHOD FOR CONSTRUCTING THE SAME
人工地盤及びその構築方法
ITOI MOTOYASU (Autor:in)
14.06.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
METHOD OF CONSTRUCTING ARTIFICIAL GROUND ON SUBBASEMENT TYPE ROAD
Europäisches Patentamt | 2018
|Artificial structure and method for constructing the same
Europäisches Patentamt | 2019
|ARTIFICIAL TURF STRUCTURE AND METHOD FOR CONSTRUCTING THE SAME
Europäisches Patentamt | 2016
|GROUND SETTLEMENT COUNTERMEASURE STRUCTURE AND METHOD OF CONSTRUCTING THE SAME
Europäisches Patentamt | 2016
|GROUND WATER LEVEL LOWERING SYSTEM AND METHOD OF CONSTRUCTING THE SAME
Europäisches Patentamt | 2018
|