Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION MANAGEMENT SYSTEM FOR GROUND IMPROVEMENT
PROBLEM TO BE SOLVED: To provide a construction management system for ground improvement, in which it is possible to easily recognize a construction state of a ground improvement body established in a ground that is invisible with naked eyes when a ground improvement work using a ground improvement method is performed.SOLUTION: The construction management system for ground improvement has operating state detection means 40 which detects various kinds of data regarding the operating state of an improvement machine 2, arithmetic processing means 50 which obtains three-dimensional image data of the finished shape of a ground improvement body established in a ground from the various kinds of data regarding the operating state of an improvement machine 2, a terminal device 60 comprising a camera 61 and a display 62, and image processing means 70 which creates an overlay image by overlaying, on an image captured by the camera 61 of the terminal device 60, the three-dimensional image data of the finished shape of the ground improvement body established in a ground corresponding to a photographing location, and which displays the overlay image on the display 62 of the terminal device 60.SELECTED DRAWING: Figure 4
【課題】地盤改良工法による地盤改良工事を行うとき、肉眼では見えない地盤中に造成した地盤改良体の施工状態を容易に確認することができる地盤改良用施工管理システムを提供する。【解決手段】改良機械2の各種の作動状態のデータを検出する作動状態検出手段40と、改良機械2の各種の作動状態のデータから地盤中に造成した地盤改良体の出来形形状の三次元画像データを求める演算処理手段50と、カメラ61とディスプレー62を備える端末装置60と、端末装置60のカメラ61で撮影した映像上に、撮影箇所に対応する地盤中に造成した地盤改良体の出来形形状の三次元画像データを重ね合わせるオーバーレイ画像を作成し、これを端末装置60のディスプレー62に表示する画像処理手段70と、を有する地盤改良用施工管理システムである。【選択図】図4
CONSTRUCTION MANAGEMENT SYSTEM FOR GROUND IMPROVEMENT
PROBLEM TO BE SOLVED: To provide a construction management system for ground improvement, in which it is possible to easily recognize a construction state of a ground improvement body established in a ground that is invisible with naked eyes when a ground improvement work using a ground improvement method is performed.SOLUTION: The construction management system for ground improvement has operating state detection means 40 which detects various kinds of data regarding the operating state of an improvement machine 2, arithmetic processing means 50 which obtains three-dimensional image data of the finished shape of a ground improvement body established in a ground from the various kinds of data regarding the operating state of an improvement machine 2, a terminal device 60 comprising a camera 61 and a display 62, and image processing means 70 which creates an overlay image by overlaying, on an image captured by the camera 61 of the terminal device 60, the three-dimensional image data of the finished shape of the ground improvement body established in a ground corresponding to a photographing location, and which displays the overlay image on the display 62 of the terminal device 60.SELECTED DRAWING: Figure 4
【課題】地盤改良工法による地盤改良工事を行うとき、肉眼では見えない地盤中に造成した地盤改良体の施工状態を容易に確認することができる地盤改良用施工管理システムを提供する。【解決手段】改良機械2の各種の作動状態のデータを検出する作動状態検出手段40と、改良機械2の各種の作動状態のデータから地盤中に造成した地盤改良体の出来形形状の三次元画像データを求める演算処理手段50と、カメラ61とディスプレー62を備える端末装置60と、端末装置60のカメラ61で撮影した映像上に、撮影箇所に対応する地盤中に造成した地盤改良体の出来形形状の三次元画像データを重ね合わせるオーバーレイ画像を作成し、これを端末装置60のディスプレー62に表示する画像処理手段70と、を有する地盤改良用施工管理システムである。【選択図】図4
CONSTRUCTION MANAGEMENT SYSTEM FOR GROUND IMPROVEMENT
地盤改良用施工管理システム
NAGAISHI MASAHIRO (Autor:in) / AKIMA TAKESHI (Autor:in) / YAMASHITA YUJI (Autor:in)
19.07.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
GROUND IMPROVEMENT BODY CREATING DEVICE, GROUND IMPROVEMENT CONSTRUCTION METHOD
Europäisches Patentamt | 2023
|GROUND IMPROVEMENT MATERIAL SLURRY AND GROUND IMPROVEMENT CONSTRUCTION METHOD
Europäisches Patentamt | 2022
|