Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
ESTABLISHMENT OF EMBANKMENT
PROBLEM TO BE SOLVED: To simplify work of fixing an upper block on a lower block when an embankment is established by piling up precast concrete blocks in multisteps as permanent forms.SOLUTION: In blocks 1 and 21, a connector is buried in an upper surface side and a lower surface side and a bolt fastening work cavity is formed to be adjacent to the connector. In the connector on the block's upper surface side, the upper surface of a connection part 12 is exposed to the upper surface of the block and the lower surface of the connection part is exposed to the bolt fastening work cavity. In the connector on the block's lower surface side, the lower surface of the connection part is exposed to the lower surface of the block and the upper surface of the connection part is exposed to the bolt fastening work cavity. The bolt fastening work cavity is opened to a left or right side surfaces of the block for a gate. An upper block is placed on a lower block, and the connection part with a bolt hole at the lower surface of the upper block is piled on the connection part with a bolt hole on the upper surface of the lower block and are connected by a bolt nut 42, and by bolt fastening work the upper block is fixed on the lower block.SELECTED DRAWING: Figure 13
【課題】 プレキャストコンクリートのブロックを残存型枠として多段に積み上げて堤防を構築するに当たり、上段のブロックを下段のブロックに固定する作業を簡単にする。【解決手段】 ブロック1、21は、上面側と下面側に連結具を埋め込み、連結具に隣接してボルト締め作業空洞を形成する。ブロックの上面側の連結具は、連結部12の上面をブロックの上面に、連結部の下面をボルト締め作業空洞に露出する。ブロックの下面側の連結具は、連結部の下面をブロックの下面に、連結部の上面をボルト締め作業空洞に露出する。ボルト締め作業空洞は、ブロックの左側面又は右側面に開口して出入口にする。上段のブロックは、下段のブロックに載せて、上段のブロックの下面のボルト孔付き連結部を、下段のブロックの上面のボルト孔付き連結部に重ねてボルトナット42で連結し、ボルト締め作業によって上段のブロックを下段のブロックに固定する【選択図】 図13
ESTABLISHMENT OF EMBANKMENT
PROBLEM TO BE SOLVED: To simplify work of fixing an upper block on a lower block when an embankment is established by piling up precast concrete blocks in multisteps as permanent forms.SOLUTION: In blocks 1 and 21, a connector is buried in an upper surface side and a lower surface side and a bolt fastening work cavity is formed to be adjacent to the connector. In the connector on the block's upper surface side, the upper surface of a connection part 12 is exposed to the upper surface of the block and the lower surface of the connection part is exposed to the bolt fastening work cavity. In the connector on the block's lower surface side, the lower surface of the connection part is exposed to the lower surface of the block and the upper surface of the connection part is exposed to the bolt fastening work cavity. The bolt fastening work cavity is opened to a left or right side surfaces of the block for a gate. An upper block is placed on a lower block, and the connection part with a bolt hole at the lower surface of the upper block is piled on the connection part with a bolt hole on the upper surface of the lower block and are connected by a bolt nut 42, and by bolt fastening work the upper block is fixed on the lower block.SELECTED DRAWING: Figure 13
【課題】 プレキャストコンクリートのブロックを残存型枠として多段に積み上げて堤防を構築するに当たり、上段のブロックを下段のブロックに固定する作業を簡単にする。【解決手段】 ブロック1、21は、上面側と下面側に連結具を埋め込み、連結具に隣接してボルト締め作業空洞を形成する。ブロックの上面側の連結具は、連結部12の上面をブロックの上面に、連結部の下面をボルト締め作業空洞に露出する。ブロックの下面側の連結具は、連結部の下面をブロックの下面に、連結部の上面をボルト締め作業空洞に露出する。ボルト締め作業空洞は、ブロックの左側面又は右側面に開口して出入口にする。上段のブロックは、下段のブロックに載せて、上段のブロックの下面のボルト孔付き連結部を、下段のブロックの上面のボルト孔付き連結部に重ねてボルトナット42で連結し、ボルト締め作業によって上段のブロックを下段のブロックに固定する【選択図】 図13
ESTABLISHMENT OF EMBANKMENT
堤防の構築
TANAHASHI HAJIME (Autor:in) / WATABE TAKESHI (Autor:in) / MIZUNO KATSUKI (Autor:in)
15.11.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
EMBANKMENT REINFORCEMENT STRUCTURE AND EMBANKMENT STRUCTURE
Europäisches Patentamt | 2021
|