BEARING REPLACEMENT METHOD FOR EXISTING CONCRETE BEAM
To provide a bearing replacement method for an existing concrete beam which can keep a wide work space, prevent inverse placement of concrete, minimize damage of concrete beam due to a replacement construction as low as possible, and minimize the sharing time in unstable temporary bearing as short as possible.SOLUTION: A bearing replacement method for an existing concrete beam in which an existing bearing 4 interposed between an existing concrete beam 5 and an understructure 2 is replaced with a new bearing S, the method executing a steps of: attaching an anchoring block for attaching an anchoring block 10 for anchoring an anchor A2 of an upper shoe of the new bearing S adjacent the existing bearing 4 and beside the existing concrete beam 5; and drilling an anchor hole for drilling an anchor hole 20 for inserting an anchor A1 of a lower shoe of the new bearing S on an understructure 2 of the new bearing 4 while bearing the existing concrete beam 5 by the existing bearing 4.SELECTED DRAWING: Figure 6
【課題】作業空間を広くとることができ、コンクリート打設が逆打ちとならず、取替工事によるコンクリート桁の損傷を極力小さくできるとともに、不安定な仮支承での共用期間を極力短くすることができる既設コンクリート桁の支承取替工法を提供する。【解決手段】既設コンクリート桁5と下部構造2との間に介装された既設支承4を新設支承Sに取り替える既設コンクリート桁の支承取替工法において、既設支承4の近傍の既設コンクリート桁5の脇に新設支承Sの上沓のアンカーA2を定着させる定着ブロック10を取り付ける定着ブロック取付工程と、既設支承4で既設コンクリート桁5支承しつつ、既設支承4の脇の下部構造2に新設支承Sの下沓のアンカーA1を挿置するためのアンカー孔20を削孔するアンカー孔削孔工程を行う。【選択図】図6
BEARING REPLACEMENT METHOD FOR EXISTING CONCRETE BEAM
To provide a bearing replacement method for an existing concrete beam which can keep a wide work space, prevent inverse placement of concrete, minimize damage of concrete beam due to a replacement construction as low as possible, and minimize the sharing time in unstable temporary bearing as short as possible.SOLUTION: A bearing replacement method for an existing concrete beam in which an existing bearing 4 interposed between an existing concrete beam 5 and an understructure 2 is replaced with a new bearing S, the method executing a steps of: attaching an anchoring block for attaching an anchoring block 10 for anchoring an anchor A2 of an upper shoe of the new bearing S adjacent the existing bearing 4 and beside the existing concrete beam 5; and drilling an anchor hole for drilling an anchor hole 20 for inserting an anchor A1 of a lower shoe of the new bearing S on an understructure 2 of the new bearing 4 while bearing the existing concrete beam 5 by the existing bearing 4.SELECTED DRAWING: Figure 6
【課題】作業空間を広くとることができ、コンクリート打設が逆打ちとならず、取替工事によるコンクリート桁の損傷を極力小さくできるとともに、不安定な仮支承での共用期間を極力短くすることができる既設コンクリート桁の支承取替工法を提供する。【解決手段】既設コンクリート桁5と下部構造2との間に介装された既設支承4を新設支承Sに取り替える既設コンクリート桁の支承取替工法において、既設支承4の近傍の既設コンクリート桁5の脇に新設支承Sの上沓のアンカーA2を定着させる定着ブロック10を取り付ける定着ブロック取付工程と、既設支承4で既設コンクリート桁5支承しつつ、既設支承4の脇の下部構造2に新設支承Sの下沓のアンカーA1を挿置するためのアンカー孔20を削孔するアンカー孔削孔工程を行う。【選択図】図6
BEARING REPLACEMENT METHOD FOR EXISTING CONCRETE BEAM
既設コンクリート桁の支承取替工法
SHOJI AKIO (Autor:in) / IWAMOTO YASUSHI (Autor:in) / SAKITANI KAZUYA (Autor:in) / IHAYA TOSHIYA (Autor:in)
27.12.2018
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
Existing beam bridge quick replacement structure and construction method
Europäisches Patentamt | 2023
|EXISTING HOUSE WALL BEAM REPLACEMENT STRUCTURE AND CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2024
|Local cutting method for existing reinforced concrete beam
Europäisches Patentamt | 2024
|Replacement structure of existing bracket of cantilever beam bridge and construction method
Europäisches Patentamt | 2020
|Gate bearing replacement device and bearing replacement method
Europäisches Patentamt | 2024
|