Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
METHOD OF CHANGING EXISTING SLAB TRACK TO SLEEPER DIRECT-COUPLED TRACK
To provide a method of changing existing slab track to sleeper direct-coupled track that replaces exchanges of damaged track slabs in existing slab track, and can easily and reliably make the change from existing slab track to sleeper direct-coupled track.SOLUTION: The method of changing existing slab track to sleeper direct-coupled track includes the following steps, namely, a step to release coupling of a rail coupling device, a step to index rails, a step to cut track slabs, a step to peel cut track slab pieces off from a concrete track bed, a step to remove the track slab pieces that have been peeled off, a step to insert sleepers, a step to reposition the rails, a step to tighten the rail coupling device, a step to inject synthetic resin to the lower part of the sleepers, and a step to bind two end parts of the sleepers.SELECTED DRAWING: Figure 1
【課題】既設スラブ軌道における損傷した軌道スラブを交換する代わりの、既設スラブ軌道からまくらぎ直結軌道への変更が、容易かつ確実に行なえる、既設スラブ軌道からまくらぎ直結軌道への変更方法を提供する。【解決手段】既設スラブ軌道からまくらぎ直結軌道への変更方法において、次の工程、すなわち、レール締結装置の締結解除工程、レールの割り出し工程、軌道スラブの切断工程、切断した軌道スラブ片のコンクリート道床からの引き剥がし工程、引き剥がした前記軌道スラブ片の撤去工程、まくらぎの挿入工程、前記レールの復位工程、前記レール締結装置の緊締工程、前記まくらぎの下部への合成樹脂の注入工程、前記まくらぎの両端部の拘束工程を備えている。【選択図】図1
METHOD OF CHANGING EXISTING SLAB TRACK TO SLEEPER DIRECT-COUPLED TRACK
To provide a method of changing existing slab track to sleeper direct-coupled track that replaces exchanges of damaged track slabs in existing slab track, and can easily and reliably make the change from existing slab track to sleeper direct-coupled track.SOLUTION: The method of changing existing slab track to sleeper direct-coupled track includes the following steps, namely, a step to release coupling of a rail coupling device, a step to index rails, a step to cut track slabs, a step to peel cut track slab pieces off from a concrete track bed, a step to remove the track slab pieces that have been peeled off, a step to insert sleepers, a step to reposition the rails, a step to tighten the rail coupling device, a step to inject synthetic resin to the lower part of the sleepers, and a step to bind two end parts of the sleepers.SELECTED DRAWING: Figure 1
【課題】既設スラブ軌道における損傷した軌道スラブを交換する代わりの、既設スラブ軌道からまくらぎ直結軌道への変更が、容易かつ確実に行なえる、既設スラブ軌道からまくらぎ直結軌道への変更方法を提供する。【解決手段】既設スラブ軌道からまくらぎ直結軌道への変更方法において、次の工程、すなわち、レール締結装置の締結解除工程、レールの割り出し工程、軌道スラブの切断工程、切断した軌道スラブ片のコンクリート道床からの引き剥がし工程、引き剥がした前記軌道スラブ片の撤去工程、まくらぎの挿入工程、前記レールの復位工程、前記レール締結装置の緊締工程、前記まくらぎの下部への合成樹脂の注入工程、前記まくらぎの両端部の拘束工程を備えている。【選択図】図1
METHOD OF CHANGING EXISTING SLAB TRACK TO SLEEPER DIRECT-COUPLED TRACK
既設スラブ軌道からまくらぎ直結軌道への変更方法
FUCHIGAMI SHOTA (Autor:in) / YOSHIKAWA SHUHEI (Autor:in) / TAKAHASHI TAKAKURA (Autor:in) / KURODA MASAO (Autor:in) / YANAGIYA MASARU (Autor:in)
31.01.2019
Patent
Elektronische Ressource
Japanisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Soft sleeper spreading device of ballastless track roadbed slab
Europäisches Patentamt | 2023
|Existing line long sleeper embedded ballastless track bed deviation regulation method
Europäisches Patentamt | 2023
|