STEEL FRAME STRUCTURE CONSTRUCTION METHOD
To provide a steel frame structure construction method capable of installing new steel studs on an existing steel beams of an existing building while ensuring silent and clean circumstances requiring no shaving work free from shaving noises, shaving vibrations or generation of a large amount dust.SOLUTION: A steel frame structure construction method comprises the steps of: boring a through hole 29 in a concrete slab 28 formed on an existing steel beam 11; disposing a first connection plate 13 on the concrete slab 28; inserting a first connection bolt 15 into the through hole 29 bored in the concrete slab 28; connecting the first connection plate 13 and the first extension member 16 with the first connection bolt 15 inserted in the through hole 29; thereby a new steel first stud 12 is connected to the existing steel beam 11, and he second connection plate 20 and the second extension member 21 are connected with the second connection bolt 22; thus the new steel second stud 19 is connected to the existing steel beam 11.SELECTED DRAWING: Figure 1
【課題】はつり工事を必要とせず、はつり音およびはつり振動の発生や多量の塵埃の発生がなく、静音および清浄な環境を維持した状態で既設建造物の既設鉄骨梁に新設鉄骨第1間柱と新設鉄骨第2間柱とを取り付けた鉄骨構造物を施工することができる鉄骨構造物施工方法を提供する。【解決手段】鉄骨構造物施工方法は、既設鉄骨梁11の上に施工されたコンクリートスラブ28に貫通孔29を穿孔し、第1連結板13をコンクリートスラブ28の上に配置し、コンクリートスラブ28に穿孔された貫通孔29に第1連結ボルト15を挿通しつつ、貫通孔29に挿通した第1連結ボルト15によって第1連結板13と第1増設部材16とを連結することで、新設鉄骨第1間柱12を既設鉄骨梁11に連結し、第2連結ボルト22によって第2連結板20と第2増設部材21とを連結することで、新設鉄骨第2間柱19を既設鉄骨梁11に連結する。【選択図】図1
STEEL FRAME STRUCTURE CONSTRUCTION METHOD
To provide a steel frame structure construction method capable of installing new steel studs on an existing steel beams of an existing building while ensuring silent and clean circumstances requiring no shaving work free from shaving noises, shaving vibrations or generation of a large amount dust.SOLUTION: A steel frame structure construction method comprises the steps of: boring a through hole 29 in a concrete slab 28 formed on an existing steel beam 11; disposing a first connection plate 13 on the concrete slab 28; inserting a first connection bolt 15 into the through hole 29 bored in the concrete slab 28; connecting the first connection plate 13 and the first extension member 16 with the first connection bolt 15 inserted in the through hole 29; thereby a new steel first stud 12 is connected to the existing steel beam 11, and he second connection plate 20 and the second extension member 21 are connected with the second connection bolt 22; thus the new steel second stud 19 is connected to the existing steel beam 11.SELECTED DRAWING: Figure 1
【課題】はつり工事を必要とせず、はつり音およびはつり振動の発生や多量の塵埃の発生がなく、静音および清浄な環境を維持した状態で既設建造物の既設鉄骨梁に新設鉄骨第1間柱と新設鉄骨第2間柱とを取り付けた鉄骨構造物を施工することができる鉄骨構造物施工方法を提供する。【解決手段】鉄骨構造物施工方法は、既設鉄骨梁11の上に施工されたコンクリートスラブ28に貫通孔29を穿孔し、第1連結板13をコンクリートスラブ28の上に配置し、コンクリートスラブ28に穿孔された貫通孔29に第1連結ボルト15を挿通しつつ、貫通孔29に挿通した第1連結ボルト15によって第1連結板13と第1増設部材16とを連結することで、新設鉄骨第1間柱12を既設鉄骨梁11に連結し、第2連結ボルト22によって第2連結板20と第2増設部材21とを連結することで、新設鉄骨第2間柱19を既設鉄骨梁11に連結する。【選択図】図1
STEEL FRAME STRUCTURE CONSTRUCTION METHOD
鉄骨構造物施工方法
MURAKAMI KATSUHIDE (Autor:in) / KAWASE AKIKO (Autor:in) / NATORI SHOICHI (Autor:in) / HAYASHI HIROSHI (Autor:in) / KUBOTA MASAHARU (Autor:in)
21.02.2019
Patent
Elektronische Ressource
Japanisch
STEEL FRAME STRUCTURE CONSTRUCTION METHOD, COLUMN, STEEL FRAME STRUCTURE
Europäisches Patentamt | 2022
|Steel structure construction supporting frame positioning method
Europäisches Patentamt | 2023
|STEEL FRAME CONCRETE BEAM STRUCTURE AND CONSTRUCTION METHOD OF STEEL FRAME CONCRETE BEAM STRUCTURE
Europäisches Patentamt | 2022
|