Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
To provide a method of constructing a basement which cannot only reduce the construction cost but also has a high degree of freedom in design.SOLUTION: A basement is constructed by passing through the processes of: a digging process to dig a hole 2 in the ground 1; a rolling process to compact a bottom of the hole 2; a retaining wall L-shaped concrete block installing process to install retaining wall L-shaped concrete blocks 6 each having a bottom plate portion 6b and a side plate portion 6a at the bottom of the hole 2 so as to face each other; a rectangular panel installing process to install a rectangular panel 8 on front and back sides of the retaining wall L-shaped concrete block 6; a backfilling process to backfill a portion 9 located outside the retaining wall concrete block 6 and the rectangular panel 8 at the hole 2; and a ceiling construction process to construct a ceiling of the basement above an area surrounded by the retaining wall concrete block 6 and the rectangular panel 8.SELECTED DRAWING: Figure 9
【課題】施工コストを抑えることができるだけでなく、設計の自由度も高い地下室の施工方法を提供する。【解決手段】地面1に穴2を掘る穴掘り工程と、穴2の底部を締め固める転圧工程と、穴2の底部に、底版部6b及び側版部6aを有する擁壁用L型コンクリートブロック6を互いに向かい合うように設置していく擁壁用L型コンクリートブロック設置工程と、擁壁用L型コンクリートブロック6の前面側及び背面側に矩形型パネル8を設置する矩形型パネル設置工程と、穴2における擁壁用コンクリートブロック6及び矩形型パネル8の外側に位置する部分9を埋め戻す埋め戻し工程と、擁壁用コンクリートブロック6及び矩形型パネル8で囲まれた領域の上側に地下室の天井を施工する天井施工工程とを経ることにより、地下室を施工する。【選択図】図9
To provide a method of constructing a basement which cannot only reduce the construction cost but also has a high degree of freedom in design.SOLUTION: A basement is constructed by passing through the processes of: a digging process to dig a hole 2 in the ground 1; a rolling process to compact a bottom of the hole 2; a retaining wall L-shaped concrete block installing process to install retaining wall L-shaped concrete blocks 6 each having a bottom plate portion 6b and a side plate portion 6a at the bottom of the hole 2 so as to face each other; a rectangular panel installing process to install a rectangular panel 8 on front and back sides of the retaining wall L-shaped concrete block 6; a backfilling process to backfill a portion 9 located outside the retaining wall concrete block 6 and the rectangular panel 8 at the hole 2; and a ceiling construction process to construct a ceiling of the basement above an area surrounded by the retaining wall concrete block 6 and the rectangular panel 8.SELECTED DRAWING: Figure 9
【課題】施工コストを抑えることができるだけでなく、設計の自由度も高い地下室の施工方法を提供する。【解決手段】地面1に穴2を掘る穴掘り工程と、穴2の底部を締め固める転圧工程と、穴2の底部に、底版部6b及び側版部6aを有する擁壁用L型コンクリートブロック6を互いに向かい合うように設置していく擁壁用L型コンクリートブロック設置工程と、擁壁用L型コンクリートブロック6の前面側及び背面側に矩形型パネル8を設置する矩形型パネル設置工程と、穴2における擁壁用コンクリートブロック6及び矩形型パネル8の外側に位置する部分9を埋め戻す埋め戻し工程と、擁壁用コンクリートブロック6及び矩形型パネル8で囲まれた領域の上側に地下室の天井を施工する天井施工工程とを経ることにより、地下室を施工する。【選択図】図9
METHOD OF CONSTRUCTING BASEMENT
地下室の施工方法
ISHIHARA HIROAKI (Autor:in)
22.03.2019
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen