PILE CONSTRUCTION METHOD AND PILE CONSTRUCTION MANAGEMENT SYSTEM
To provide a pile construction method and a pile construction management system capable of properly constructing piles, while suppressing period and cost required for a ground exploration, even in a case where a large number of piles are constructed in a large scale site, and the like.SOLUTION: A pile construction method comprises: a support layer data forming step #1 of forming support layer data exhibiting whole aspect of support layers assumed in pile construction object areas from support layer depth information at ground exploration points; a pile length setting step #2 of setting pile length at each pile construction point on the basis of the support layer data formed in the support layer data forming step #1; and a support layer data updating step #5 of adding support layer arrival depth information of piles at each pile construction point that is sequentially obtained in pile construction work as the support layer depth information and updating the support layer data.SELECTED DRAWING: Figure 1
【課題】大規模な敷地に大量の杭を施工する場合等でも、地盤調査に要する期間や費用を抑えながら杭の施工を適切に行える杭施工方法及び杭施工管理システムを提供する。【解決手段】杭施工方法において、地盤調査地点の支持層深度情報から杭打ち対象地で想定される支持層の全貌を示す支持層データを作成する支持層データ作成ステップ♯1と、支持層データ作成ステップ♯1にて作成された支持層データに基づいて杭打ち地点毎に杭長を設定する杭長設定ステップ♯2と、杭打ち作業にて逐次取得される杭打ち地点毎の杭の支持層到達深度情報を支持層深度情報として追加して支持層データを更新する支持層データ更新ステップ♯5と、を備える。【選択図】図1
PILE CONSTRUCTION METHOD AND PILE CONSTRUCTION MANAGEMENT SYSTEM
To provide a pile construction method and a pile construction management system capable of properly constructing piles, while suppressing period and cost required for a ground exploration, even in a case where a large number of piles are constructed in a large scale site, and the like.SOLUTION: A pile construction method comprises: a support layer data forming step #1 of forming support layer data exhibiting whole aspect of support layers assumed in pile construction object areas from support layer depth information at ground exploration points; a pile length setting step #2 of setting pile length at each pile construction point on the basis of the support layer data formed in the support layer data forming step #1; and a support layer data updating step #5 of adding support layer arrival depth information of piles at each pile construction point that is sequentially obtained in pile construction work as the support layer depth information and updating the support layer data.SELECTED DRAWING: Figure 1
【課題】大規模な敷地に大量の杭を施工する場合等でも、地盤調査に要する期間や費用を抑えながら杭の施工を適切に行える杭施工方法及び杭施工管理システムを提供する。【解決手段】杭施工方法において、地盤調査地点の支持層深度情報から杭打ち対象地で想定される支持層の全貌を示す支持層データを作成する支持層データ作成ステップ♯1と、支持層データ作成ステップ♯1にて作成された支持層データに基づいて杭打ち地点毎に杭長を設定する杭長設定ステップ♯2と、杭打ち作業にて逐次取得される杭打ち地点毎の杭の支持層到達深度情報を支持層深度情報として追加して支持層データを更新する支持層データ更新ステップ♯5と、を備える。【選択図】図1
PILE CONSTRUCTION METHOD AND PILE CONSTRUCTION MANAGEMENT SYSTEM
杭施工方法及び杭施工管理システム
HAYASHI MIZUKI (Autor:in) / ANDO SATORU (Autor:in) / ONISHI NAOHIRO (Autor:in) / ITO TSUKASA (Autor:in) / SUGIURA KENJI (Autor:in) / OMOTO SATOSHI (Autor:in)
24.06.2019
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2020
|Europäisches Patentamt | 2015
|PILE CONSTRUCTION DEVICE, PILE CONSTRUCTION METHOD AND PILE
Europäisches Patentamt | 2015
|