Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
STEEL STRUCTURE CONCRETE PILE, COLUMN, UNDERGROUND BEAM JOINT INTEGRATED COLUMN BASE STRUCTURE
To solve the problem that a steel frame foundation column base part composed of piles and columns of steel framed construction has been mounted to a solid steel material using a circular connection steel pipe on a concrete pile, but the delivery date of the circular connection steel pipe takes long.SOLUTION: According to the present invention, when solid steel is first attached to the upper part of a concrete pile and a rectangular connecting steel pipe is attached thereto, the delivery time of the rectangular steel pipe can be shortened and the construction period can be shortened. In addition, the upper, lower and horizontal adjustment is easy, the field construction performance is good, and the joint strength is large.SELECTED DRAWING: Figure 10
【課題】従来、鉄骨建築の杭と柱からなる鉄骨基礎柱脚部はコンクリート杭の上に円形の接続鋼管用いて中実鋼材に取付けていたが、この円形の接続鋼管の納期が掛るという問題がある。【解決手段】本発明は、コンクリート杭の上部に先に中実鋼材を取り付けてから角形の接続鋼管をその上に取付ければ、角形鋼管の納期が早くて建設工事の工期が短縮できる。また、上下・水平調節が容易で、現場施工性がよく、大きな継手強度を併せ持っている。【選択図】図10
STEEL STRUCTURE CONCRETE PILE, COLUMN, UNDERGROUND BEAM JOINT INTEGRATED COLUMN BASE STRUCTURE
To solve the problem that a steel frame foundation column base part composed of piles and columns of steel framed construction has been mounted to a solid steel material using a circular connection steel pipe on a concrete pile, but the delivery date of the circular connection steel pipe takes long.SOLUTION: According to the present invention, when solid steel is first attached to the upper part of a concrete pile and a rectangular connecting steel pipe is attached thereto, the delivery time of the rectangular steel pipe can be shortened and the construction period can be shortened. In addition, the upper, lower and horizontal adjustment is easy, the field construction performance is good, and the joint strength is large.SELECTED DRAWING: Figure 10
【課題】従来、鉄骨建築の杭と柱からなる鉄骨基礎柱脚部はコンクリート杭の上に円形の接続鋼管用いて中実鋼材に取付けていたが、この円形の接続鋼管の納期が掛るという問題がある。【解決手段】本発明は、コンクリート杭の上部に先に中実鋼材を取り付けてから角形の接続鋼管をその上に取付ければ、角形鋼管の納期が早くて建設工事の工期が短縮できる。また、上下・水平調節が容易で、現場施工性がよく、大きな継手強度を併せ持っている。【選択図】図10
STEEL STRUCTURE CONCRETE PILE, COLUMN, UNDERGROUND BEAM JOINT INTEGRATED COLUMN BASE STRUCTURE
鉄骨構造物コンクリート杭・柱・地中梁接合部一体化柱脚構造
UCHIDA MASAKATSU (Autor:in) / MATSUO TAKAYUKI (Autor:in) / YOKOTOBI JUNICHI (Autor:in)
18.07.2019
Patent
Elektronische Ressource
Japanisch
STEEL STRUCTURE PILE/COLUMN JOINT INTEGRATED COLUMN BASE STRUCTURE WITHOUT UNDERGROUND BEAM
Europäisches Patentamt | 2021
|REINFORCED CONCRETE COLUMN/STEEL COLUMN/STEEL BEAM JOINT STRUCTURE
Europäisches Patentamt | 2016
|REINFORCED CONCRETE COLUMN/STEEL BEAM JOINT STRUCTURE
Europäisches Patentamt | 2016
|- Steel composite concrete beam-column joint structure
Europäisches Patentamt | 2018
|